BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

This is a service / maintenance or supply contract in Modesto, California. Contact the soliciting agency for additional information.

Start/Delivery Date January 2024 Project Duration 12-18 months Modesto City-County Airport Agreement for Consultant Services Feasibility Study- Primary Runway 28R Extension Introduction: The Public Works Department, Airport Division seeks to obtain an agreement for consulting services to perform a feasibility study for a potential runway extension of the Modesto Airports primary runway 28R. The current length of 5904 to expand to a length of 7000-7500 Contractor Responsibilities: The consultant will be responsible for managing the project through completion, gathering critical information specific to the Airport, aircraft, airspace and surrounding neighborhood and hiring their own sub-contractors if needed to complete this study. City Responsibilities: The Airport is to supply any relevant documentation for data gathering such as the Airport Layout Plan, Obstruction Analysis or any other pertinent document or study the Airport may have. Scope of Project: 1. Data gathering from numerous sources such as but not limited to: CAD files, ALP, Zoning and land Use Plans, Transportation plan, detailed operations data by aircraft type and destination, obstacle data, airplane planning manuals for planned critical aircraft. 2. Determine Critical Aircraft and stage length: Determine existing critical aircraft and stage length pairing, identify potential critical aircraft for a runway length of 7000-7500 3. Preliminary Runway Longitude and Gradient Analysis: Evaluate existing runway longitudinal grades, determine future runway longitudinal grade requirements, estimate effective runway gradient to be used in runway length requirement adjustments. 4. Runway Separation Requirements and Runway Length Requirements: This information should be based on FAA standards required to accommodate the existing and future critical aircraft, document deficiencies to the current airfield configuration. Runway length requirements should be based on aircraft planning manual analysis considering temperature, elevation, gradient, stage length and fuel load with full passenger load. 5. Runway Alternatives: RSA, ROFA, OFZ, POFZ, MALSR, RPZs, TSA, TOFA and runway/taxiway separation. Alternatives to maximize runway length on property to meet critical airport design standards. Document non-standard conditions and required modifications to FAA design standards. 6. Obstacle Analysis of Preferred Alternative: Part 77, Departure surface and TERPS 7. 7. Preliminary Construction Phasing 8. Opinions of Probable Construction Costs 9. Itemization of Probable Land Acquisition and Costs Identify and denote the potential properties impacted by this expansion and subsequent acreage affected. This identification should be listed in the comprehensive report and outlined in the drawing set. 10. Prepare Individual Presentations for both the Airport Advisory Committee and the Modesto City Council. 11. Final Report to be delivered via hard copy and electronic copy

Conceptual

Transportation Terminals

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
167
Active Projects
87
Bidding Soon
1,711
All Active Projects
725
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 1, 2024

img_map_placeholder

Multiple Locations, Modesto, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.