Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 24, 2023 at 8:00 PM
Updated January 29, 2024
Renovation of an educational facility in Farmington, New Mexico. Completed plans call for the renovation of a 17,116-square-foot educational facility.
Shiprock South Campus Math and Science Building Requests for Qualifications (RFQ) for the procurement of Furnishings, Fixtures, and Equipment (FF&E) for the new Shiprock South Campus Math & Science Building located on US Highway 491, in Shiprock, New Mexico, San Juan County. The new building is approximately 17,116 square feet, with construction recently completed. All inquiries/questions shall be sent in writing via email to Teresa Holtsoi (email: tholtsoi@dinecollege.edu) by 08/25/2023 by 3:00P.M. The new Diné College Math Science Building is located at Shiprock, NM. The project is designed to achieve LEED Silver. Included will be construction of new parking lot facilities which will be connected to the existing Diné Campus. The new math science building is comprised of a 17,116 SF facility and accommodates approximately 562 students. Details regarding the school layout and FF&E plans are included in Attachment F. These will consist of a room by room FF&E Plan and the building plan (F). Details regarding currently specified manufacturers (subject to change in the RFDP) are included in Attachment E; it is these manufacturers to whom the list of preferential pricing is referenced. However, Offerors should note that the package will include but not be limited to standard classroom and administrative office furnishings, Science Labs, and Student Lounge / Lobby areas
Post-Bid
Educational
$37,000.00
Public - City
LEED Certification, Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 6, 2023
October 6, 2023
491 Shiprock St, Farmington, NM
Related To This Project
Farmington, NM
Bid Date: Oct 24 2023
Farmington, NM
--
Farmington, NM
Bid Date: Jun 15 2021
Farmington, NM
Bid Date: Apr 27 2021
Farmington, NM
Bid Date: Nov 19 2019
Farmington, NM
Bid Date: Nov 15 2019
Farmington, NM
Bid Date: May 14 2019
Farmington, NM
Bid Date: May 14 2019
Farmington, NM
Bid Date: Aug 16 2023
Farmington, NM
--
Farmington, NM
Bid Date: Aug 18 2023
Farmington, NM
--
Farmington, NM
Bid Date: Apr 18 2024
Farmington, NM
Bid Date: Jul 03 2023
Farmington, NM
Bid Date: Jun 28 2023
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
