BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 1, 2023 at 8:00 PM

Updated January 26, 2024

Renovation of an educational facility in Chicago, Illinois. Completed plans call for the renovation of a educational facility.

Roosevelt HS - Boiler 2 Re-Tube and Repairs ONLY PREQUALIFIED POOL Various Trades PLA for work over 25K Questions Due Date: Aug 11th 2023, 11:00 AM CDT Questions submitted via online portal. Boiler 2 Safety Relief Valves Furnish labor and materials to replace (4) 3 Kunkle relief valves Boiler 2 Re-Tubing: Cut the complete set of tubes from the boiler and remove them from the premises. Prepare the tube sheets removing sharp edges and burrs. Flush out the shell of ALL scale and debris. Clean any soot from the fireside. Set in the boiler (206) 2-1/2 SA-178A boiler tubes. New tubes to be Flare rolled front and rear of the tube sheets. Service any refractory repairs needed. Replace hand holes and cover plates removed to perform this work. All questions/requests must be received two (2) business days prior to bid closing.

Bid Results

Educational

$50,550.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
503
Active Projects
281
Bidding Soon
3,593
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 24, 2023

September 25, 2023

Project location map

3436 W Wilson Ave, Chicago, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.