Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a civil project in Lancaster, Pennsylvania. Conceptual plans call for site work for a water / sewer project.
The City of Lancaster (City) operates two water treatment plants and a 620-mile distribution system. Water is piped from the Susquehanna River about a mile to the water treatment plants, and then is pumped another 6 miles from the treatment plants to the Oyster Point Reservoir. From the reservoir it is gravity fed over 7 miles to the City. All of these are 42 steel transmission mains, are 3/8 thick, and were installed in 1956. In 2013, the City started preliminary design to address the lack of redundancy and vulnerability of its transmission system. This Susquehanna Large Diameter Replacement Main Project originally consisted of 5 phases of construction from the Susquehanna River to the western city limits of Lancaster. The purpose of the project is to provide system resiliency, given that the sole transmission main from the Susquehanna Water Treatment Plant is over 60 years old, and to also provide additional pressure during peak demand periods. The existing 42-inch main has had numerous breaks and supplies 66% of the total consumptive flows. Phase 1 of the transmission main installation project, from the Oyster Point Reservoir into the City, was completed in 2021. The City intends to proceed with the next two phases in the following prioritization order: Phase 3: Raw Water Transmission Main from the Susquehanna Low Service Pumping Station on the Susquehanna River to the Susquehanna Water Treatment Plant (approximately 8,000 linear feet of large diameter piping). Phase 2: Finished Water Transmission Main from the Susquehanna River Treatment Plant to the Oyster Point Reservoir (approximately 30,350 linear feet of large diameter piping). Time is of the essence. The City has applied for $26 million of ARPA grants through the Commonwealth Financing Agency (CFA) for this project. All construction must be complete by September 30, 2026. The Bidding assistance and assistance during construction will be addressed after the design; this work need not be priced for this RFP submittal. Consultants must prioritize the work to apply for permits ASAP, especially the railroad crossings. Design will proceed even if Lancaster does not get grant funding. The objective of this Request for Proposals (RFP) is to contract with an engineering firm (the Consultant) to provide professional engineering services for the detailed design of the water mains and other related work for Phases 2 and 3 of the Susquehanna Large Diameter Replacement Main Project. Services include, but are not limited to surveying, geotechnical work, utility location, preparation of drawings, plans and specifications for bidding and construction purposes, permitting, and other engineering duties related to water main design and installation for Phases 2 and 3, based on an evaluation of potential routes, costs and design considerations prepared by ARRO contained herein. As of November 10, 2023, the project is currently under evaluation. A timeline to select a design firm has not been identified. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.
Conceptual
Water / Sewer
$200,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 13, 2024
Multiple Locations, Lancaster, PA
Related To This Project
Lancaster, PA
Bid Date: Oct 01 2024
Lancaster, PA
Bid Date: Jan 13 2022
Lancaster, PA
Bid Date: Jan 13 2022
Lancaster, PA
Bid Date: Jan 13 2022
Lancaster, PA
--
Lancaster, PA
Bid Date: Dec 22 2021
Lancaster, PA
Bid Date: Nov 02 2021
Lancaster, PA
Bid Date: May 12 2021
Lancaster, PA
Bid Date: Sep 01 2023
Lancaster, PA
--
Lancaster, PA
Bid Date: Jun 23 2021
Lancaster, PA
Bid Date: Aug 07 2023
Lancaster, PA
Bid Date: Sep 14 2023
Lancaster, PA
Bid Date: Aug 31 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Try it free. The data you need to build the relationships you want.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.