Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a mixed-use development in Minneapolis, Minnesota. Completed plans call for the renovation of a educational facility.
**As of October 25, 2023 project was awarded to Loeffler Construction & Consulting, LLC but awarded amount is not available.** Construction Services for replacement of the UPS in Walter Library, located on the east bank of the Twin Cities campus. Refer to the Request for Proposal documents (found in the Attachments tab) for full project details/requirements. The Board of Regents of the University of Minnesota (the "University") is requesting Proposals to provide construction services for replacement of the UPS in Walter Library, located on the east bank of the Twin Cities campus (the "Project"). The University of Minnesota - Twin Cities Campus (UMN-TC) Office of Information Technology (OIT), as well as other UMN departments, have IT equipment installed in numerous telecom facilities, server rooms, and data centers across the entire campus to serve all departments within the University. Walter Library, located at 117 Pleasant St SE, Minneapolis, MN 55455, is one of such facilities that hosts approximately 3,486 SqFt, of the U of M Minnesota Supercomputing Institute (MSI). It is housed on the entire fifth floor and parts of the basement and fourth floor of Walter Library. The Uninterrupted Power Supply (UPS) systems for the MSI facility is located at the Basement room B40 of Walter library. During a recently concluded Engineering and Building systems study of the OIT Facilities, the following deficiencies were observed: 1. 2 UPSs located in Room S49 (EPS6000, 375KVA, and 500KVA) that supplies Room B40 are at the end of their useful life and will need to be replaced. 2. UPS located in room S42 (EPS6000, 375KVA) is also at the end of its useful life, and will need to be replaced including all the associated batteries for all UPSs The University requests the services of a Contractor to: 1.Replace the 3 Uninterrupted Power Supplies (UPS) systems that will provide power to the IT equipment. 2.Provide and install Computer Room Cooling Units (CRCU) and associated piping and connections. 3.Extend the Existing Fire Alarm System to new construction area and all its associated communication systems. 4.Assist Commissioning agent who will provide fully integrated commissioning. 5.Follow the Phasing Protocol that has been developed by the AE Team of Record as well as all the scope as designed in the Construction Documents Note: It will be important for the Contractor to adhere to the set Phasing protocol from old UPS to new UPS. Dunham and Associates is the Architect/Engineer of Record for the Project. The selected Respondent will perform the Work for a Contract Sum that shall be a fixed, lump sum that shall include all costs necessary to complete the Work in accordance with the Contract Documents, including Respondent's overhead and profit. The total construction budget for this Project is $1,677,000 (current dollars, no escalation). The University requires the Project to be substantially complete by no later than March 29, 2024. The Contractor may start with the external scope so as to complete that before Winter. Anticipated Authorization to Proceed September 28, 2023 Question Deadline 08/31/2023 at 12:00 PM CT
Award
Library
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 20, 2023
October 5, 2023
117 Pleasant St SE, Minneapolis, MN
Related To This Project
Minneapolis, MN
Bid Date: Aug 31 2023
Minneapolis, MN
Bid Date: Sep 05 2023
Minneapolis, MN
Bid Date: Sep 05 2023
Minneapolis, MN
Bid Date: Aug 31 2023
Minneapolis, MN
Bid Date: Sep 22 2023
Minneapolis, MN
--
Minneapolis, MN
--
Minneapolis, MN
Bid Date: Sep 13 2023
Minneapolis, MN
Bid Date: Sep 14 2023
Minneapolis, MN
Bid Date: Sep 13 2023
Minneapolis, MN
Bid Date: Sep 13 2023
Minneapolis, MN
Bid Date: Sep 07 2023
Minneapolis, MN
Bid Date: Sep 06 2023
Minneapolis, MN
Bid Date: Sep 28 2023
Minneapolis, MN
Bid Date: Aug 29 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.