BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Camp Lejeune, North Carolina. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Award Details Contract Award Date: Sep 27, 2023 Contract Award Number: N4008523D0013 Task/Delivery Order Number: N4008523F6859 Contractor Awarded Unique Entity ID: C8EZY7MJXQB4 Contractor Awarded Name: QUADRANT CONSTRUCTION INC Contractor Awarded Address: Jacksonville, NC 28546 USA Base and All Options Value (Total Contract Value): $150,433.00 Only Civil/Paving MACC Contractors listed on the General Requirements cover page may submit a proposal for this ROICC Camp Lejeune area of responsibility project. See attached documents for scope of work and any applicable drawings. Estimated Cost Range: Between $100,000 and $250,000 Requests for Information (RFIs): RFIs must be submitted by the prime contractor to tony.d.benson.civ@us.navy.mil. The cut off for RFIs is September 1, 2023 by 2:00 PM EST in order to process all inquiries by the proposal due data *The for this project is based on a financial range. The is listed as the highest possible cost from the range provided by a stakeholder or official project document. This project will expand the existing parking lot at SAW400. The existing paint markings will be removed and will be re-painted to be 90 degree parking to match the new parking addition. DETAILED REQUIREMENTS: 1. Remove all existing parking space markings. All existing arrows and stop bars will remain. 2. Remove all existing rock and soil within the limits of new pavement. 3. All subgrade is to be proofrolled under the observation of the NAVFAC construction manager and third party geotechnical engineer prior to ABC stone placement. 4. Install 8" of compacted ABC on top of the compacted subgrade. Compact all ABC stone in lifts at a maximum of 6" each lift. ABC stone must be compacted to 98% of a modified proctor obtained by the third party geotechnical engineer. 5. Install 2" thick asphalt intermediate course - RI19.0-C 6. Install 2" thick asphalt surface course - RS9.5-C 7. Ensure all new asphalt sheet flows to the ditch that parallels old sawmill road. 8. Install new wheel stops in all new asphalt parking spaces. See detail "D" on sheet C103. 9. Re-establish any disturbed vegetation with centipede sod. 09/01/2023 at 2:00 PM ET

Award

Roads / Highways

$150,433.00

Public - Federal

Paving, Site Work

7

9

3

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
22
Bidding Soon
462
All Active Projects
192
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 15, 2023

October 16, 2023

img_map_placeholder

To Be Determined, Camp Lejeune, NC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.