Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of an industrial development in Halstead, Kansas. Working plans call for the construction of a industrial development; and for site work for a industrial development.
All inquiries concerning this Request for Proposals (RFP) should be directed to: Ethan Reimer, City Manager 303 Main Street, PO Box 312 Halstead, Kansas 67056 (316) 835-2286 ext. 305 or FAX / (316) 835-2377 ereimer@halsteadks.com INTRODUCTION AND BACKGROUND The City of Halstead is requesting proposals from qualified firms or contractors to provide design/build and construction management services for a new 3500 sq ft Industrial Speculative Building to be located in the Halstead Industrial Park. In 2023, the City of Halstead was awarded a Building a Stronger Economy (BASE) 2.0 grant from the Kansas Department of Commerce. The desired outcome of the grant is for the construction of an up to a 3500 sq ft building that would be available for sale or lease to prospective industries and help spur economic development activity in Halstead. The intent of the City is to enter into a contractual agreement with qualified firm that can handle both the design and construction of the project as well as meet required timetables per the BASE 2.0 grant guidelines. The selected Design/Build firm will work in conjunction with city staff and the Halstead Governing Body to assist in the completion of the design, engineering, and provide construction services for the project. Proposals Distributed to City Council September 21, 2023 City Council Review Week of September 25, 2023 Consultant Interviews w/City Council (if needed) Week of October 2, 2023 Consultant Selection by City Council October 9, 2023 Draft Contract to City Council Week of October 9, 2023 Final Contract to City Council October 23, 2023 Notice to Proceed Issued to Firm To Be Scheduled SCOPE AND NEEDS OF THE PROJECT The chosen design/build team will lead a comprehensive and complete process for design, development, and construction of an speculative building suitable for industrial purposes. Specifically, the design/build team will collaborate significantly with city staff to incorporate the following, but not limited to, needs for a speculative industrial building: A. Steel building and frame with a minimum of 14' side walls and some insulation B. Suitable reinforced concrete pad in relation to structure and industrial use C. Industrial sized, overhead door(s) D. Climate controlled office space, restroom(s), and storage area E. Driveway and surrounding parking or operating area around building Timeliness and cost efficiency is a core reason why the city has chosen to pursue a design/build method for this project. The City expects that the design/build team will control costs through integration, collaboration and innovative design and construction solutions and will set an overall not to exceed price for the total project as negotiated in a final contract. This project must meet all federal, state and local codes or other applicable regulations related to the BASE 2.0 grant award. The City will give preference to proposals that can meet an anticipated completion date of June 30, 2024. V. PROJECT BUDGET The total final budget for this project has yet to be determined. The City of Halstead received $144,000.00 in BASE 2.0 Grant funds and estimated a budget around $250,000.00 as part of that grant application. The City of Halstead is responsible for all costs over the BASE 2.0 award and has previously dedicated funds to land acquisition for the project. Confirmed Shortlist.
Final Planning
Industrial
$250,000.00
Public - City
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 20, 2023
January 22, 2024
To Be Determined, Halstead, KS
Related To This Project
Halstead, KS
Bid Date: Jul 07 2023
Merriam, KS
Bid Date: Sep 01 2023
Overland Park, KS
--
Lawrence, KS
Bid Date: Aug 29 2023
Topeka, KS
Bid Date: Sep 07 2023
Olathe, KS
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.