BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Aurora, Colorado. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Reference Number 0000328189 The Peoria Hills Park Playground Renovation project involves the construction of a new playground, concrete walking paths, picnic shelter, site furnishings, and landscaping. The current playground is small and out of date. Proposed improvements include but are not limited to earthwork, erosion control, concrete paths throughout the park, an accessible play area for children ages 2-5 and 5-12, a shelter with picnic tables and trash receptacles and benches. Landscape improvements include a limited renovation of the irrigation system. Question Acceptance Deadline 08/30/2023 at 3:00 PM MT Questions are submitted online No Bidders may make written inquiries concerning this ITB to obtain clarification of requirements. Written inquiries shall be emailed to: Angie Young, Senior Procurement Agent, at ayoung@auroragov.org AND Kristin Chewiwi, Procurement Supervisor at kchewiwi@auroragov.org AND Trent Woolley, Project Manager, at twoolley@auroragov.org. General Requirements - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % Each Bid shall be accompanied by an appropriate guarantee in the form of a Bid Bond made payable to the City of Aurora in an amount of not less than five percent (5%) of the amount of the Bid. Original bid bonds do not have to be mailed; however, each bidder should maintain the original on file should the City request it at a later time. Liquidated Damages which are $200.00 per day. The Contract Documents require that all work be completed within 120 consecutive calendar days plus 10 consecutive calendar days for mobilization after issuance of Notice to Proceed. The estimated cost for this project is from $875,000.00 to $925,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *The City of Aurora reserves the right to reject any and all Bids, to waive informalities and irregularities, and to accept that bid which is considered to be in the best interest of the City.

Post-Bid

Playgrounds / Parks / Athletic Fields

$925,000.00

Public - City

Paving, Site Work

28

15

7

6

Subscribe For Documents

73 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
38
Bidding Soon
995
All Active Projects
415
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 13, 2023

October 13, 2023

img_map_placeholder

12401 E Florida Ave, Aurora, CO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.