BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Highland, California. Completed plans call for site work for a water / sewer project.

Elder creek channel improvements From 600 ft south of abbey way north to old Greenspot road The work, in general, consists of in general demolition of existing rectangular concrete channel and reinforced concrete box culverts; constructing concrete rectangular channel and reinforced concrete box culverts; procurement and installation of precast concrete box sections; installation of temporary shoring; grading; asphalt concrete paving; rock placement, fence removal and fence installation, utility relocation; and doing other work appurtenant thereto. This project requires a Class A Contractor's license. issued by the State of California Contractors State Licensing Board. The Contractor must maintain this license from contract award through acceptance. All Contractors, including any out-of-state contractors/subcontractors, must comply with all applicable laws and regulations of the State of California at the time of bid and award. QUESTIONS: Bidders must submit all questions in writing, by e-pro, mail, or e-mail. The deadline for bidder questions is 4:00 P.M. on FRIDAY, August 09, 2024. The successful bidder will be required to furnish a Labor and Materials Bond and a Faithful Performance Bond, each in a penal sum equal to one hundred percent of the contract price. All bonds are to be secured from a surety that meets all of the State of California bonding requirements, as defined in Code of Civil Procedure Section 995.120, and is admitted by the State of California. The Engineer will issue two (2) Notices to Proceed, the first being a Notice to Proceed with Submittals, and the second being a Notice to Proceed with Construction. The Contractor shall begin construction work within 15 days after the Notice to Proceed with Construction (excluding Saturday, Sunday, and holidays). Pursuant to Section 1-1.07, "DEFINITIONS", of the Standard Specifications, "day" means "24 consecutive hours running from midnight to midnight; calendar day". The Contractor is allotted 200 WORKING DAYS to complete the work after which $10,000 of LIQUIDATED DAMAGES will be assessed per working day until completion.

Award

Water / Sewer

$16,701,175.00

Public - County

Site Work

31

5

33

5

Subscribe For Documents

54 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
191
Active Projects
95
Bidding Soon
2,118
All Active Projects
956
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 22, 2024

January 6, 2025

img_map_placeholder

Multiple Locations, Highland, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.