BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Pecos, New Mexico. Completed plans call for site work for a water / sewer project.

plans and specifications. Shop drawings that are submitted to the Architect/Engineer for review do not constitute "in writing" unless it is brought to the attention of the Architect/Engineer that specific changes are being proposed. In any event, the responsibility for proposing changes to the plans and specifications by means of shop drawings resides with the Contractor and no additional costs resulting from such changes will be paid to the Contractor. The Owner reserves the right to reject any and all bids, to waive technical irregularities, and to award the contract to the Bidder whose bid it deems to be in the best interest of the Owner. Alternate Bid means the amount stated in the Bid as the sum to be added from the amount of the Base Bid if the corresponding change in the project scope, materials, and/or methods of construction is awarded by the Owner. The recipient may at any time, by written order and without notice to the sureties, make changes within the general scope of this contract in the services or work to be performed. If such changes cause an increase or decrease in the contractor's cost or time required to perform any services under this contract, whether or not changed by any order, the recipient shall make an equitable adjustment and modify this contract in writing. The contractor must assert any claim for adjustment under this clause in writing within 30 days from the date it receives the recipient's notification of change, unless the recipient grants additional time before the date of final payment. The Owner reserves the right to reject any and all bids, to waive technical irregularities, and to award the contract to the Bidder whose bid it deems to be in the best interest of the Owner. New Mexico in the amount of 5% of the total bid, or the equivalent in cash by means of a cashier's check or in a form satisfactory to the Owner, must accompany each bid in accordance with the Instructions to Bidders. A 100% performance bond and a 100% payment and materials bond executed by a surety company If you have questions on the implementation of this grant condition, please contact Michael Deane at Deane.Michael@epa.gov or Kiri Anderer at Anderer.Kirsten@epa.gov.

Bid Results

Water / Sewer

$734,219.00

Public - City

Site Work

21

12

21

6

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
7
Bidding Soon
157
All Active Projects
60
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 18, 2023

May 13, 2024

img_map_placeholder

Multiple Locations, Pecos, NM


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.