BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 15, 2024 at 7:00 PM

Updated January 27, 2024

Site work and new construction of an educational facility in Rockford, Ohio. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

As of January 8, 2024, this project has not yet been awarded. A timeline for award has not yet been established. Athletic Building - Parkway Local Schools Includes the following: Water, sanitary, and vent system for restrooms. Gas service for HVAC units and instantaneous water heaters Refer to plans for additional informaton General Construction: The multi-purpose athletic facility consists of a new 13,667 square foot pre-engineered metal building (PEMB) with masonry veneer up to 10 feet aound the entire building. Manufactured metal wall panels are placed on the PEMB structure. All roof panels and accessoies, as well as select interior perforated metal liner panels are to be provided by the PEMB manufacturer. Interior wall construction consists of masonry units to underside of the pre-engineered metal roof deck, with select walls switching over to metal stud concrete topping sits in the center of the building, with metal stairs and pipe railing leading up to the mezzanine. New hollow metal door frames with hollow metal doors and steel overhead sectional doors, and aluminum framed storefront system. Athletic equipment for the gym, track, and locker rooms is indicated on the equipment plans. Site Work: Work includes demo of existing gravel and trees, grading, excavation, gravel pavement, concrete pavement/sidewalks, bollards, underground utilities and seeding. Plumbing Work: Includes the following: Water, sanitary, and vent system for restrooms. Gas service for HVAC units and instantaneous water heaters Refer to plans for additional informaton. HVAC Work: Includes the following: Exhaust fans, furnaces, mini-split heat pump, and unit heaters. Refer to plans for additional information. Electrical Work: Includes the following: A new 240/120V electrical service, LED exterior and interior lighting, receptacles, gym equipment connections, and HVAC equipment connections. Refer to plans for additional information. Technology Work: Includes the following. Extend the existing telecommunications network, security system, access control system, security camera system, and paging system to the new building from the existing building. provide new video projectors. Refer to plans for additional information. *The bid list for this project may be incomplete. If you have been invited to bid on this project by the owner, please notify our editorial staff at contentcase@constructconnect.com.

Award

Educational

$2,818,762.00

Public - City

New Construction, Site Work

61

29

47

3

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
218
Active Projects
145
Bidding Soon
1,598
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 19, 2023

March 4, 2024

Project location map

400 Buckeye St, Rockford, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.