BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Northbrook, Illinois. Working plans call for the renovation of a municipal facility.

As of October 16, project is on hold. No definite date for the rebid. All questions related to this bid must be submitted no later than 10 a.m. on September 29, 2023 to Jack Tierney, Management Analyst at jack.tiereney@northbrook.il.us. Contact Information: For inquiries, interested parties should contact: Jack Tierney, Management Analyst, Village of Northbrook, Department of Public Works at jack.tierney@northbrook.il.us or 847-664-4128. Description: The Village of Northbrook is seeking proposals from qualified contractors for the installation of a new fiberglass door with a woodgrain look and arched door frame, incorporating a 1" insulated arched glass, simulated wood panels at the lower portion of the door and appropriate hardware at the Village of Northbrook Village Hall at 1225 Cedar Lane, Northbrook, Illinois. The scope of work includes the installation of a door with a continuous hinge, reuse of the existing ADA operator, creation of a new door frame, and replacement of the threshold. The door opening dimensions are approximately 74" by 100". 1. Removal of Existing Door and Frame: Carefully remove the existing door, frame, and threshold while minimizing any damage to the surrounding structure. 2. Installation of Fiberglass Door and Frame: Install a new fiberglass door with a woodgrain look and arched frame, featuring a 1" insulated arched glass and simulated wood panels at the lower portion, meeting the specified dimensions of approximately 74" by 100". Ensure proper alignment and level installation of the door within the new frame. 3. Continuous Hinge Installation: Install a continuous hinge to ensure smooth and durable door operation. 4. Hardware Installation: Install all necessary hardware components, including handles, locks, and any other specified items. 5. ADA Operator Reuse: Reuse the existing ADA operator for the newly installed door, ensuring it is integrated seamlessly and functions properly. 6. Threshold Replacement: Install a new threshold that complements the design of the new door and frame. 7. Finishing Touches: Ensure all components are properly aligned, adjusted, and functional. Apply any necessary finishing touches, such as sealing and painting. 8. Clean-Up: Clean the work area and dispose of any debris resulting from the installation.

Final Planning

Municipal

$375,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
186
Active Projects
99
Bidding Soon
1,965
All Active Projects
844
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 5, 2023

April 16, 2024

img_map_placeholder

1225 Cedar Ln, Northbrook, IL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.