BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an office development in Melbourne, Florida. Completed plans call for the renovation of a office development.

The contractor shall furnish all the necessary personnel, material, and equipment pertaining to the renovations for this facility (except as otherwise specified) to complete this project stated in the Statement of Work to a satisfactory state for the Contracting Officer Technical Representative (COTR). This contract will be performed at the following National Weather Service Weather Forecast Office (WFO) : MLB WFO MELBOURNE 421 Croton Road Melbourne, Fl 32935 The following will be required: Restrooms - Men and Women Remove and replace restroom stall hardware & wall partitions, for each restroom with new solid plastic wall partitions. Replace 2 ea. counter vanities with new sinks and faucets. Counter top and side border colors to match Kitchen - Employee Breakroom. Clean and paint steel cleanout boxes. Clean and prep walls for painting. Install 2 ea toilets and 1 ea urinal which are ADA-compliant, Elongated toilets 17-19" seat height models. Urinals also have ADA requirement of 13.5" min. depth and 17" max. rim height above FF. Prep and paint all walls, and door jambs using two coats of interior Satin paint. Color will be decided later. Clean floor and grout joints and seal tile floor. 2. Kitchen - Employee Breakroom. Clean, prime and paint metal lockers Remove all cabinets, countertops, sink and faucet. Install new custom wood cabinets. Configuration to be determined. Install new quartz countertops. Install new backsplash behind sink. Install new LED under counter lights, over sink and counter. Install new matching 16" shelf type wall bar on wall opposite of door. Install new stainless sink and faucet. Remove existing wall covering. Seal, prime and apply two coats of paint to walls, jambs, doors and ceiling. Colors decided later. Install new ceramic tile and ceramic baseboard. Clean floor and grout joints and seal tile floor. All colors and styles including flooring, counter top, paint, and sink to be selected by NWS WFO Staff. Contractors will submit their project estimate, GSA Contract Number, DUNS Number, billing address, phone and fax numbers on their bid sheet and send those to the National Weather Service representative. The National Weather Service is a Federal Agency and is Tax Exempt. Prime and Painting Interior Surfaces For new sheetrock surfaces, one coat of primer prior to two coats of high-quality interior satin, or equivalent sheen paint is required. Texture may be needed and matching texture on pre-existing walls as required. Preparation of surfaces includes substrate cosmetic repairs, existing coating preparation and treatments such as filling in nail holes, filling minor cracks, wire brushing rust spots, scraping existing coating where peeling, de-glossing, treating stained and mildewed areas. For pre-existing sheetrock surfaces one coat of high-quality interior satin, or equivalent sheen paint is required. Two coats are optional and must be defined by the COTR. Preparation of surfaces includes substrate cosmetic repairs, existing coating preparation and treatments such as filling in nail holes, filling minor cracks, wire brushing rust spots, scraping existing coating where peeling, de-glossing, treating stained and mildewed areas. Low VOC paints and materials must be used on this project. Additional preparation includes protection of existing surfaces not to be coated. Contractor will provide false walls of plastic to protect the equipment and the desktops that are in the area. Personnel and equipment must be protected from dust and fumes as much as possible. All furniture removal for this project will be completed by the contractor. The contractor will supply a choice of paint and/or stain samples for the local office to select color preference. Contractor will remove all trash from site. Contractor shall follow government labor rates. Contractors can the project in order to give an accurate bid. Project Warranty Paint and/or stain should be of high quality with a minimum manufactures warranty of 5 years. Contractor shall guarantee their work to NWS for a period of 1 year. Please see the attached document for evaluation criteria, pictures, related clauses and specifications. Please confirm you can perform the work in the specified time period. information can be found in the attached document. Please make sure to consult this document regarding information. Please do not ask questions to the onsite person during the site . All questions shall be directed to veronica.Stroud@noaa.Gov. Questions should be received no later than 08/25/2023. Level of : Between $25,000 and $100,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. NWWP92042300255

Post-Bid

Office

$100,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
42
Bidding Soon
884
All Active Projects
384
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 28, 2023

September 27, 2023

img_map_placeholder

421 Croton Rd, Melbourne, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.