BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Montgomery, Alabama. Completed plans call for site work for a playground / park / athletic field.

The City of Montgomery is required to comply with the Beason-Hammon Alabama Taxpayer and Citizen Protection Act, 31-13-1 et seq. of Code of Alabama 1975 (Act No. 2011-535), subsequently all bidders are required to submit an E-Verify Affidavit stating they are enrolled in the E-Verify Program and the entire associated Memorandum of Understanding on the outside of their sealed bid proposals. The City of Montgomery adopted Resolution 63-2021, an administrative plan for a 30% minimum participation goal for disadvantaged, minority and women owned business enterprises for public works projects. This resolution is included in the bid documents for contractors to review and acknowledge review by signing Exhibit A. The successful bidder is required to carry Workmen's Compensation Insurance and Public Liability Insurance, and if a subcontractor is employed, Contractor's Contingent Liability Insurance. Bidders are required to file with bid a certified check or bid bond through a surety company authorized to do business in the State of Alabama; either form made payable to the City for an amount not less than 5% of the City's estimated cost or of the contractor's bid, but in no event more than $50,000.00. Bidders are hereby notified that all provisions of Section 80, Act No. 571 Regular Session of June 19, 1959, approved November 19, 1959, entitled "An Act to Regulate the Licensing of General Contractors" shall be strictly observed. Also, it is necessary for persons submitting bids for work involving $50,000.00 or more to show satisfactory evidence of license as a general contractor. A bond in a reliable surety company authorized to do business in the State of Alabama must be given by the successful bidder, such bond to be for the sum of 100% of the contract price conditioned for the prompt and faithful performance of contract terms and a surety bond in the amount equal to 50% of the contract prices as security for the payment for all persons performing labor and furnishing materials in connection with the contract. The City reserves the right to accept or reject any and all bids and waive technicalities. Contract shall not be binding upon either party or considered closed until approved by the Mayor of the City of Montgomery Questions concerning the project can be directed to: Morgan Garner, PE, Principal, Garner & Associates Engineering PC, at morgan@garner-engineering.com

Award

Playgrounds / Parks / Athletic Fields

$318,300.00

Public - City

Site Work

6

9

33

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
20
Bidding Soon
448
All Active Projects
181
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 7, 2023

October 9, 2023

img_map_placeholder

220 Hall St, Montgomery, AL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.