BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a detention facility in Chicago, Illinois. Completed plans call for the renovation of a 5,000-square-foot detention facility.

The Federal Bureau of Prisons (FBOP) herein issues solicitation 15BFA023B00000043 for the of a firm-fixed-price construction contract for a project entitled FS Drainage and Floor, at the Metropolitan Correctional Center (MCC) Chicago, in Chicago, Illinois. MCC Chicago is a federally owned facility at 71 W. Van Buren Street, Chicago, IL 60605. The project consists of the following: 1. The contractor shall be responsible for removing the existing quarry tile floors and thin- mortar down to sound concrete substrates and disposed of in a contractor provided dumpster. This work will be completed in the entire Food area, including the tile in all 3 cooler boxes (Dairy, Food Bank, Produce) and Food Administrator Office. Approximately 5000 sqft. 2. The Contractor shall remove all existing ceiling tiles from the kitchen work area prior to beginning demolition work, approximately 5,000 sqft, to protect them from damage during the of the work. The Contractor shall carefully the ceiling tiles for storage, and the Contractor shall re-install them near the to the construction project. The institution will provide space on to store the ceiling tiles for the Contractor. The Contractor shall replace all ceiling tiles damaged during the removal and reinstallation process with tiles that match the existing. These existing ceiling tiles are a specialty product for the Kitchen environment, for regular removal and cleaning. The Contractor shall protect all existing light fixtures and all existing Kitchen elements that will remain during the demolition and construction process. 3. The contractor will work with MCC Pipefitter, Facility Manager, and COR and perform a non-invasive sewer .video providing a thorough, detailed, and precise analysis in real time. A technologically advanced camera with high-resolution imaging and waterproof protection will be used. The camera will be attached to a flexible rod for complete mobility and maneuverability. A pipeline gauge and other tools can also be attached. 4. The contractor will use pipe locating equipment and mark all sewer lines on the concrete floor throughout Food . 5. Prior to demolition and replacement of all Kitchen drain lines, drainage devices and cleanouts; the Contractor shall perform a camera of all the below floor kitchen drainage lines and components. The camera shall be coordinated with the institution staff (Facility Manager/COR/Pipe Fitter) to verify all existing conditions of the kitchen drainage system, prior to demolition and construction. 6. Two drains will be added outside of each egress door (2) as marked on the drains drawing, both doors are in Food . 7. The contractor will work with MCC Pipefitter, Facility Manager, and COR after the camera and create an as built drawing showing all changes that needed to be made prior to the of any work. 8. It shall be the responsibility of the Contractor to complete work in accordance with Federal, State, and Local Code Standards. Additional procedures and materials may be required than is indicated herein. If any item specified herein conflicts with the applicable codes and recommendations, the Contractor shall bring it to the attention of the Contracting Officer Representative for immediate resolution. 9. Contractor to remove all concrete needed to make all repairs/replacements. All concrete prepping and cutting equipment will be electrical, with all construction work being in a basement no gas-powered equipment will be allowed. Wet cut saws and dust controlling vacuums will be used on all equipment. 10. After all plumbing repairs/additions have been made, the contractor will work with the MCC Pipefitter, Facility Manager, and COR, to verify proper drainage on all lines with a large volume water test, (underground stack test). The test will be monitored using sewer video equipment. 11. After all plumbing repairs/additions have been made, the contractor will ensure all concrete repairs are done in such a way that the new seamless coating can be installed over these concrete repairs in a reasonable amount of time (EXAMPLE: additive to concrete mix to speed up cure times). Time frames will be discussed and approved by the MCC Facility Manager, and COR. 12. The contractor will begin preparations for urethane mortar resurfacing system. This will provide a sealed, waterproof, durable, and seamless finish. 13. The contractor will prepare the floors with a virtually dust-free, and odorless shot-blasting method. 330-390 steel shot will be used to provide a medium blast profile per ICRI CSP5. Edges where the shot-blast machine cannot reach will be hand ground with diamond grinders connected to dust-collecting vacuums. 14. Following the above preparation, the contractor will install a high solids urethane slurry/broadcast flooring system at a nominal 3/16" thickness. This specialty flooring system will be designed to withstand heavy traffic and is highly resistant to thermal shock. Color to be determined by MCC COR 15. The contractor to Install 2-inch Cant cove base to the floor/wall interface around the total floor and around the seven (7) structural columns to provide a watertight "bathtub effect" for the entire area. NOTE: No cove base against Freezer and Refrigerator insulated panel walls. 16. A caulk joint will be installed against Freezer and Refrigerator insulated panel walls instead of the 2'' Cant cove base. 17. Contractor to install a heavy layer of "Novolac" epoxy will then be applied to the floors and cove base. This is a 100% solids "Novolac"-based specialty coating compound formulated to provide excellent temperature (up to 220 degrees Fahrenheit intermittent), acid, chemical and abrasion resistance, approximately 5000 sqft of floor. 18. Contractor to install a reinforced wall coating in the dishwashing area, approximately 400 sqft of wall space. oRemove the existing paint down to concrete substrate. oPatch any damaged or pitted areas with 100% solids plural component epoxy patching compound. oInstall 100% solids plural component thixotropic filler/primer. oSpray apply, 100% solids plural component Kevlar and Fiberglass stranded epoxy system at a minimum of 45 mils. oInstall one final 100% solids plural component glaze coat at 6-8 mils. Access to the specifications and drawings attachments will require an active https://sam.gov vendor registration (log in) AND may require a specific role or domain linked to your registration. If you encounter problems requesting access to these documents, please contact the Federal Desk at 866-606-8220. Interested bidders must be registered in the System for Management (SAM) at https://sam.gov. Pursuant to Federal Acquisition Regulation (FAR) 36.204, the estimated of the project lies between $250,000 to $500,000 (NOTE: This range is one of 8 ranges from FAR 36.204 and is not meant to imply that the project has necessarily been estimated/budgeted to the maximum of the selected range. It merely conveys that the estimate/budget lies somewhere within that range.) The North American Industrial Classification System (NAICS) code applicable to this requirement is 238330 (Flooring Contractors) with a corresponding small business size standard of $19 million. The solicitation is exclusively for small business contractors. The solicitation will be distributed solely through the website at https://sam.gov. Hard copies of the solicitation will not be made . The website provides download instructions. All future information about this solicitation, including any amendments, will also be distributed solely through this website. Interested parties are responsible for continuously monitoring this website to ensure that they have the most recent information about this proposed contract action. IMPORTANT: Any contractor interested in obtaining a contract with the Federal Bureau of Prisons must be registered in the System for Management (SAM) at https://sam.gov. If you have questions about SAM, Government procurements in general, or need assistance in the preparation of your /proposal/offer, a local Procurement Technical Assistance Center (PTAC) may be able to help. The Procurement Technical Assistance Program was authorized by Congress in 1985 in an effort to expand the number of businesses capable of participating in the Government marketplace. To locate a PTAC near you, go to http://www.aptac-us.org. Any questions relating to the solicitation after the closing of the pre- conference/site shall be sent in WORD FORMAT to Trisha Holm, Contracting Officer, via at tmanderson@bop.gov no later than Friday, September 22, 2023 at 1:00 P.M. CST. In order to provide sufficient response time prior to the due , the Government is establishing the above cut-off for questions about the solicitation. All bidders shall bid/offer in accordance with the current solicitation to include all amendments (if any) as issued by the Contracting Officer only. *The for this project is based on a financial range. The is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Jails / Prisons

$375,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
183
Active Projects
94
Bidding Soon
1,816
All Active Projects
791
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 11, 2023

November 10, 2023

img_map_placeholder

71 W Van Buren St, Chicago, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.