BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in Colton, California. Completed plans call for site work for a road / highway.

WORK: The Works consists of, but not limited to modification of traffic signal located at the intersection of La Cadena Dr & Valley Blvd and all necessary work shown on the Construction Drawings Plan No. 6156 and Bid Specifications. The successful bidder will be required to furnish the City with a Performance Bond equal to 100% of the successful bid, and a Payment (Labor and Materials) Bond equal to 100% of the successful bid, prior to execution of the Contract. All bonds are to be secured from a surety that meets all of the State of California bonding requirements, as defined in Code of Civil Procedure Section 995.120, and is admitted by the State of California. Bids must be accompanied by cash, a certified or cashier's check, or a Bid Bond in favor of the City in an amount not less than ten percent (10%) of the submitted Total Bid Price. Each bidder shall be a licensed contractor pursuant to the Business and Professions Code and shall be licensed in the following appropriate classification(s) of contractor's license(s), for the work bid upon, and must maintain the license(s) throughout the duration of the Contract: Bidders shall possess the following California Contractor's license in order to perform the Work of this Project: Class "A" or Class C-10 or a letter from Contractor's Licensing Board outlining the combination of various licenses necessary to perform all the work at the time the bid is submitted to the City. Each bidder shall also have minimum experience of five (5) years and must have completed at least (3) three similar projects within the past ten (10) years. (See Instructions to Bidders, Page 5, Section 10 for more details). The successful bidder will be required to furnish the City with a Performance Bond equal to 100% of the successful bid, and a Payment (Labor and Materials) Bond equal to 100% of the successful bid, prior to execution of the Contract. All bonds are to be secured from a surety that meets all of the State of California bonding requirements, as defined in Code of Civil Procedure Section 995.120, and is admitted by the State of California. QUESTIONS: All questions must be submitted in writing by 5:00 P.M. on before August 14, 2023, to Victor Ortiz via email: vortiz@coltonca.gov. No questions will be received after this time. TIME OF COMPLETION: 120 CALENDAR DAYS

Award

Roads / Highways

$306,983.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
199
Active Projects
99
Bidding Soon
2,208
All Active Projects
874
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 2, 2023

September 9, 2024

img_map_placeholder

W Valley Blvd & N La Cadena Dr, Colton, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.