Site work and paving for a civil project in Tabor, South Dakota. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
The project generally consists of water main relocation and site restoration in various locations identified in the project limits. The Engineers estimated construction cost is $465,000 Bids shall be submitted on the prescribed form. Bids will be rejected if they show any conditions or uncalled for alternative bids. All bids shall be on the basis of cash payment according to the terms of the bidding documents. The submittal of a Bid will constitute an incontrovertible representation by Bidder that the Bidder has examined carefully the bidding documents, visited the site, is familiar with the local conditions under which the work is to be performed, and correlated Bidders observations with the requirements of the bidding documents. Each bid shall be accompanied by Bid Security as specified in the bidding documents. Successful bidder shall begin the Work on receipt of the Notice to Proceed and shall complete the Work within the Contract Time. Work is subject to liquidated damages. The B-Y Water District reserves the right to retain the bid security of the three lowest bidders for a period not to exceed 30 days after the date and time set for opening of the bids. The B-Y Water District reserves the right to reject any or all bids or any parts thereof. The low responsive bidder will be required to certify to compliance with the American Iron and Steel provision of the Consolidated Appropriations Act of 2014. This certification form may be found on page AIS-22 of the State Revolving Fund (SRF) General Conditions and must be included in the bid proposal. Please be advised that waivers or exemptions from the American Iron and Steel provision that cite International Trade Agreements DO NOT comply with the Consolidated Appropriations Act of 2014 as it applies to the SRF programs. Claims from suppliers that the American Iron and Steel provision does not apply to certain products based on the International Trade Agreement exemptions of the Consolidated Appropriations Act of 2014 will not be accepted.
Bid Results
Roads / Highways
$419,352.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 11, 2023
October 11, 2023
To Be Determined, Tabor, SD
Related To This Project
Tabor, SD
Bid Date: Mar 23 2022
Tabor, SD
Bid Date: Nov 06 2023
Tabor, SD
Bid Date: Nov 08 2024
Tabor, SD
Bid Date: Dec 17 2024
Tabor, SD
Bid Date: Nov 04 2025
Tabor, SD
Bid Date: May 12 2022
Vermillion, SD
Bid Date: Oct 03 2023
Sioux Falls, SD
--
Vermillion, SD
Bid Date: Sep 19 2023
Custer, SD
Bid Date: Mar 03 2022
Sturgis, SD
Bid Date: Feb 23 2022
Brookings, SD
Bid Date: Mar 07 2022
Madison, SD
Bid Date: Mar 03 2022
Sioux Falls, SD
Bid Date: Mar 03 2022
Tea, SD
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.