BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 13, 2023 at 8:00 PM

Updated November 15, 2023

Site work for a water / sewer project in Wenatchee, Washington. Completed plans call for site work for a water / sewer project.

Bank Stabilization Work 2023 is three erosion control projects along the Columbia River within Chelan County. Work includes approx. 180 feet at Entiat Park, 250 feet at Stemilt Creek (Historical Site 45CH302 Area B Site 2 near the intersection of Malaga Road and Malaga/Alcoa Highway, and 1150 feet at Confluence State Park. Scope of work includes, but is not limited to site preparation, water work measures, TESC, clearing and grubbing, earthwork, material placement, planting, irrigation, site restoration, and site improvements.

Award

Water / Sewer

$1,394,350.00

Public - County

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
32
Active Projects
7
Bidding Soon
313
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 29, 2023

October 30, 2023

Project location map

Multiple Locations, Wenatchee, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.