Published November 10, 2023 at 7:00 PM

Updated October 1, 2024

Renovation of a golf course in Hermitage, Pennsylvania. Completed plans call for the renovation of a golf course.

It is the intent of the Owner to enter into a single contract for General Construction, which includes HVAC, plumbing, and electrical trades. Bids shall include a Bid Security Bond, payable to the Buhl Park Corporation, in an amount of ten percent (10%) of the bid, in accordance with Instructions to Bidders, as included in the Contract Documents. It is the intent of the Owner to enter into one (1) Contract for General Construction. 1. The entire Project and all information shown on the Contract Documents is being Bid under one General Contract. This contract includes all trades (i.e., General, HVAC, Plumbing, Electrical, etc.). Any reference to separate contractors (GC, HC, PC, EC, etc.) that may appear in the Contract Documents are usual references to the trade involved and may be a subcontractor to the General Contractor. Any reference to General Contractor, Contractor, Heating Contractor, Plumbing Contractor, Electrical Contractor, throughout the Contract Documents shall mean the General Contractor Such Bid Bond shall be submitted with the understanding that it shall guarantee that the Bidders Bid will not be withdrawn for a period of at least sixty (60) days after the scheduled closing time for receipt of bids; that if the Bid is accepted, the Bidder will execute the Form of Agreement, as provided by the Owner, with all blanks appropriately filled and will submit the required 100% Performance and Labor and Material Bonds (submitted on A.I.A. Document A312) and 100% Maintenance Bond as specified in Section 007216, Article 11; and that in the event of withdrawal of said Bid within said period, or the failure to enter into said Agreement and submit said Bonds within ten days after the Bidder has received notice of the acceptance of the Bid, the Bidder shall be liable to the above mentioned Owner for the full amount of such Bond as representing the damage to the Owner on account of the default of the Bidder in any particular hereof. The Bid Bond of all Bidders whose Bids are not accepted will be returned within ten calendar days after the scheduled bid opening date. 1. Contractors withdrawal of Bid: a. A bidder may only withdraw a bid if there is an honest and good-faith mistake (which must be supported by evidence) in the calculation of the bid price. A bidder has two business days from bid opening to withdraw a bid. b. The Owner reserves the right to accept or decline the Contractors Withdrawal of Bid Request and reserves the right to retain the bid bond. c. A bidder who withdraws a bid will not be permitted to bid on the project a second time (should it be rebid) or provide any work or materials to the project. d. If the Owner chooses to rebid the project, the bid bond of the withdrawing bidder will be forfeited to the Owner to supplement the rebid costs. The only electronic format Contract Documents will be available in is portable document format (pdf); Contract Documents will not be available in any of these electronic formats AutoCAD, Microsoft Word, Excel, etc Due to the fact that the project is financed, in part, by a grant from the Commonwealth of Pennsylvania, Contractors shall comply with all applicable Federal and State laws, regulations, and grant requirements. The term of this Grant shall commence on the Effective Date (as defined below) and shall end on JUNE 30, 2026, subject to the other provisions of this Grant.

Award

Golf Course

$793,600.00

Public - City

Renovation

27

22

9

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Substitution Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Warranties
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Masonry Mortaring, Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications, Decorative Metal
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Heavy Timber, Sheathing, Shop-Fabricated Structural Wood, Finish Carpentry, Millwork, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Steep Slope Roofing, Shingles and Shakes, Roofing and Siding Panels, Siding
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Wood Doors, Specialty Doors and Frames, Access Doors and Panels, Entrances and Storefronts, Windows, Wood Windows, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Finishes, Stone Facing, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Signage, Interior Specialties, Partitions
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Office Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings, Common Work Results for Furnishings, Fabrics, Window Treatments, Furnishings and Accessories, Furnishing Accessories, Clocks, Rugs and Mats, Runners, Furniture
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, HVAC Fans, Air Outlets and Inlets
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Identification for Electrical Systems, Low-Voltage Electrical Distribution, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Enclosed Switches and Circuit Breakers, Facility Electrical Power Generating and Storing Equipment, Power Filters and Conditioners, Capacitors, Lighting, Interior Lighting, Emergency Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Unit Paving, Site Improvements, Fences and Gates, Screening Devices
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
209
Active Projects
139
Bidding Soon
1,312
All Active Projects
637
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 11, 2023

November 7, 2023

img_map_placeholder

1290 Forker Blvd, Hermitage, PA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Renovations to the Golf Learning Center of the Buhl Park Golf Course and Driving Range

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.