BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Grimes, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

NE Beaverbrooke Boulevard and Iowa 141 Intersection Improvements 1221329 Est. Value: $ 1,571,535.00 The NE Beaverbrooke Boulevard and IA 141 project includes intersection improvements to provide an east leg to the intersection. The project includes a northbound right turn lane, a southbound dual left turn lane, a northbound dual left turn lane extension, and new traffic signals. The project also consists of earthwork, storm sewer, sidewalk pavement, signing, pavement markings, traffic control, erosion control, and final surface restoration. The Contractor shall substantially complete the overall project within seventy five (75) working days. Substantial completion for the overall project shall be defined as all utility, grading, pavement, and traffic signal construction completed, with the streets and sidewalks fully open to traffic. Should the Contractor fail to substantially complete the work within this timeframe, liquidated damages of One Thousand Dollars ($1,000.00) per calendar day will be assessed for work not substantially completed within the designated Contract term(s). Should the Contractor choose to commence construction in the fall of 2023, working days will be suspended over the winter months. Suspension of working days will begin after the project site has been successfully winterized, all lanes are open to traffic, and approved by the City. Should the Contractor complete all construction work except for the traffic signals and any work associated to the traffic signals due to the long lead times, suspension of working days will be allowed. The Contractor shall fully complete the overall project within ten (10) working days of the substantial completion. Full completion for the overall project shall be defined as all surface restoration and all improvements ready for final acceptance. Should the Contractor fail to fully complete the work within this timeframe, liquidated damages of Five Hundred Dollars ($500.00) per calendar day will be assessed for work not fully completed within the designated Contract term(s).

Bid Results

Roads / Highways

$1,348,968.00

Public - City

Paving, Site Work

78

5

12

6

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
113
Active Projects
49
Bidding Soon
989
All Active Projects
350
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 19, 2023

October 9, 2023

April 15, 2024

img_map_placeholder

IA-141 & NE Beaverbrooke Blvd, Grimes, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.