Site work for a water / sewer project in Springfield, Massachusetts. Completed plans call for site work for a water / sewer project.

Provin Mountain Reservoir 3 and 4 Improvements REBID Project #24-47 [BDO #B24-G9BN] Estimated Construction Cost: $1,500,000.00. All questions regarding the bid or its specifications must be made in writing and received by the CPO (theo.theocles@waterandsewer.org) by February 29, 2024 at 4:30 PM in order to be considered. Provin Mountain Reservoir - Reservoir Nos. 3 and 4 Improvements Contract No. 1. The Work includes, but is not necessarily limited to, the following major items: Extension of 34 access manholes with watertight locking hatches, installation of polyolefin waterproofing tape and epoxy adhesive on approximately 2,500 linear feet of buried storage tank roof slab joint, including excavation and restoration, Installation of approximately 1,550 linear feet of chain link fence and demolition of approximately 850 linear feet of existing chain link fence, installation of flanged ductile iron piping and bends with concrete bulkheads, concrete cradles, concrete splash pads, bituminous pavement, and stainless-steel mesh screens on 2 existing overflow pipe headwalls, and loam and seed of disturbed areas. Successful Contractor will be required to furnish the Commission with both a 100% Performance Bond and 100% Payment Bonds at the time of contract execution. 4/12/24 Estimated Contract Start Date Nature and scope of work: The Work includes, but is not necessarily limited to, the following major items: a. Extension of 34 access manholes with watertight locking hatches. b. Installation of approximately 2,500 linear feet of polyolefin waterproofing tape and epoxy adhesive. c. Installation of approximately 1,550 linear feet of chain link fence and demolition of approximately 850 linear feet of existing chain link fence. d. Installation of flanged ductile iron piping and bends with concrete bulkheads, concrete cradles, concrete splash pads, bituminous pavement, and stainlesssteel mesh screens on 2 existing overflow pipe headwalls. e. Loam and seed of disturbed areas. The time for substantial completion of this project is 170 calendar days from the date of the written Notice to Proceed. and completed and ready for final payment within 200 days in accordance with the General Conditions. The estimated project value is: $1.2 Million. Addendum #1-#2 have been issued a of 3-4-2024.

Bid Results

Water / Sewer

$1,284,017.00

Public - City

Site Work

18

12

9

5

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
616
Active Projects
364
Bidding Soon
4,782
All Active Projects
1,922
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 7, 2024

April 12, 2024

September 29, 2024

img_map_placeholder

To Be Determined, Springfield, MA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.