EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 29, 2023 at 8:00 PM

Updated January 26, 2024

Renovation of a mixed-use development in Schertz, Texas. Completed plans call for the renovation of a educational facility.

Project Magnitude: $1,200,000.00 - $1,600,000.00 The intent of this project is to to replace the existing access control and video surveillance systems with new GENETEC access control and GENETEC video surveillance systems. Projects are located within the Schertz-Cibolo-Universal City School District. Consistent with Education Code 44.031(b) and applicable state rules, the District will open, evaluate and either accept or reject the proposal(s), based on the RFCSP's criteria. Consistent with Texas Government Code 552.104, proposals are not public information until a recommendation has been made to and accepted by the District's Board of Trustees. Proposal responses must be clearly identified with the RFCSP number, description, and to the attention of the Purchasing Department. The Purchasing Department may open unmarked submissions to properly identify them. Respondents are advised to correctly mark submissions to protect the integrity of the proposal. Respondents accept all responsibility for forwarding the proposal to the address above within the specified time or it is unresponsive. The Schertz-Cibolo-Universal City School District reserves the right to accept or reject any or all proposals in the best interest of the district and to waive any formalities or irregularities in the RFCSP process.

Post-Bid

Educational

$1,600,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

12

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Use of Site, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Reference Standards, Temporary Facilities and Controls, Temporary Utilities, Temporary Barriers and Enclosures, Temporary Fencing, Execution and Closeout Requirements, Execution, Application, Cleaning and Waste Management
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Wood Doors, Hardware, Door Hardware
Division 09 - Finishes

Division 09 - Finishes

Tiling, Ceilings, Flooring, Carpeting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical and Cathodic Protection, Facility Lightning Protection, Lighting
Division 27 - Communications

Division 27 - Communications

Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection

Find More Local Projects

Within 75 Miles of This Project
95
Active Projects
45
Bidding Soon
2,340
All Active Projects
981
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 6, 2023

October 6, 2023

img_map_placeholder

Multiple Locations, Schertz, TX

Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

SCUC ISD Security Access Control Upgrade

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.