BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Hot Springs, Arkansas. Completed plans call for site work for a playground / park / athletic field; and water / sewer project.

Description: Replacement of Tent Camp Bathroom Sewer Line at Lake Catherine State Park SPECIFICATIONS 1. The Prospective Contractor shall remove and replace the gravity sewer line at the Tent Camp Bathroom at Lake Catherine State Park based on the specifications outlined below. 2. The Prospective Contractor shall perform the removal of existing gravity sewer line. Existing gravity line may be abandoned in place, or the trench can be reused. 3. The Prospective Contractor shall install approximately 511 linear feet of six inch (6") SDR-26 Pipe to replace gravity sewer line. 4. The Prospective Contractor shall install one (1) PVC Cleanout in sewer line between Tent Camp Bathroom and Manhole 19B. 5. The Prospective Contractor shall install gravity sewer line according to latest version of American Water Works Association Standard C605. 6. The Prospective Contractor shall be solely responsible for trench and excavation safety systems in accordance with Act 291 of 1993. 7. The Prospective Contractor shall conform to safety requirements of federal, state, or local agency having jurisdiction for sheeting, shoring, and bracing of trenches. 8. The Prospective Contractor shall provide and maintain ample means and devices to promptly remove and dispose of water entering trench during time trench is being prepared for pipe laying, during laying of pipe, and until backfill at pipe zone is completed. 9. The Prospective Contractor shall slope sides of trench, provide trench boxes, or provide shoring as required by OSHA safety requirements. 10. Native trench backfill material diameter must not exceed three inches (3"), with maximum rock size of twelve inches (12"), and all lifts compacted to 85% standard proctor density. 11. The Prospective Contractor shall install metallic locator tape a minimum of twelve inches (12") above top of pipe. 12. Pipe zone backfill must have crushed stone or washed rock with a diameter of 1/4 " to 3/4 " or as approved by ADPHT, and four inch (4") maximum lifts. 13. The Prospective Contractor shall dispose of excess excavated material offsite. 14. The Prospective Contractor shall cover trench with a minimum of six inches (6") topsoil and turf all disturbed areas by seeding. 15. The Prospective Contractor shall complete all work on or before September 30, 2023. 16. The Prospective Contractor shall ensure all materials are installed to manufacturer's specifications, state, county, and city codes. 17. The Prospective Contractor shall be responsible for all post clean up and disposal of all debris from project site. 18. The Prospective Contractor shall construct any and all construction safety barriers to keep bystanders out of work areas and at a safe distance for the duration of the project. 19. The Prospective Contractor shall furnish all tools, materials, equipment, and labor necessary to complete project. 20. The Prospective Contractor shall prevent unnecessary damage to any part of surrounding buildings. 21. The Prospective Contractor shall remove all debris, including nails and metals, and all disposable materials offsite at the end of each workday. 22. The Prospective Contractor shall work during normal business hours. 23. The Prospective Contractor shall schedule all work with park officials. 24. The Prospective Contractor shall provide all necessary Taxes and Freight. 25. The Prospective Contractor shall provide one (1) year warranty that applies to all work performed. . The Prospective Contractor shall furnish Workmen's Compensation, General Liability Insurance, and Vehicle Insurance Certificates to ADPHT prior to a resulting contract. 27. The Prospective Contractor shall be responsible for all materials deliveries and protection of during construction. 28. Final inspection to be conducted by Travis McClure or his designee. 29. Any discovered damage must be reported to park representative in writing and must be submitted to ADPHT Central Office Buyer, prior to any repair work being completed, for approval and any adjustment to the purchase order. Information regarding the repair should include all labor, materials, and cost. REQUIRED SITE VISIT: A. The Prospective Contractor shall make a site visit with Park Superintendent or his designee. B. The Prospective Contractor shall meet with the Park Superintendent or his designee at the Visitor Center at the park. . The Prospective Contractor shall bring site verification form to the site visit to have park personnel conducting the site visit to sign after completion of the site visit. The signed site visit verification form must be submitted with the Prospective Contractor's bid response. E. The Prospective Contractor shall arrive no later than ten (10) minutes prior to the actual start time of the site visit. F. The Prospective Contractor and/or their representatives present and participating in the required site visit will be given the opportunity to ask questions during site visit. Although answers will be provided as a courtesy to all Prospective Contractors in attendance, no oral responses provided by ADPHT personnel to any question posed at the required site visit will become part of a contract resulting from this solicitation unless the oral response provided is reduced to writing and attached as an addendum to this solicitation

Post-Bid

Playgrounds / Parks / Athletic Fields

$125,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
14
Bidding Soon
277
All Active Projects
111
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 7, 2023

October 9, 2023

img_map_placeholder

1200 Catherine Park Rd, Hot Springs, AR

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.