Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a mixed-use development in Hot Springs, Arkansas. Completed plans call for site work for a playground / park / athletic field; and water / sewer project.
Description: Replacement of Tent Camp Bathroom Sewer Line at Lake Catherine State Park SPECIFICATIONS 1. The Prospective Contractor shall remove and replace the gravity sewer line at the Tent Camp Bathroom at Lake Catherine State Park based on the specifications outlined below. 2. The Prospective Contractor shall perform the removal of existing gravity sewer line. Existing gravity line may be abandoned in place, or the trench can be reused. 3. The Prospective Contractor shall install approximately 511 linear feet of six inch (6") SDR-26 Pipe to replace gravity sewer line. 4. The Prospective Contractor shall install one (1) PVC Cleanout in sewer line between Tent Camp Bathroom and Manhole 19B. 5. The Prospective Contractor shall install gravity sewer line according to latest version of American Water Works Association Standard C605. 6. The Prospective Contractor shall be solely responsible for trench and excavation safety systems in accordance with Act 291 of 1993. 7. The Prospective Contractor shall conform to safety requirements of federal, state, or local agency having jurisdiction for sheeting, shoring, and bracing of trenches. 8. The Prospective Contractor shall provide and maintain ample means and devices to promptly remove and dispose of water entering trench during time trench is being prepared for pipe laying, during laying of pipe, and until backfill at pipe zone is completed. 9. The Prospective Contractor shall slope sides of trench, provide trench boxes, or provide shoring as required by OSHA safety requirements. 10. Native trench backfill material diameter must not exceed three inches (3"), with maximum rock size of twelve inches (12"), and all lifts compacted to 85% standard proctor density. 11. The Prospective Contractor shall install metallic locator tape a minimum of twelve inches (12") above top of pipe. 12. Pipe zone backfill must have crushed stone or washed rock with a diameter of 1/4 " to 3/4 " or as approved by ADPHT, and four inch (4") maximum lifts. 13. The Prospective Contractor shall dispose of excess excavated material offsite. 14. The Prospective Contractor shall cover trench with a minimum of six inches (6") topsoil and turf all disturbed areas by seeding. 15. The Prospective Contractor shall complete all work on or before September 30, 2023. 16. The Prospective Contractor shall ensure all materials are installed to manufacturer's specifications, state, county, and city codes. 17. The Prospective Contractor shall be responsible for all post clean up and disposal of all debris from project site. 18. The Prospective Contractor shall construct any and all construction safety barriers to keep bystanders out of work areas and at a safe distance for the duration of the project. 19. The Prospective Contractor shall furnish all tools, materials, equipment, and labor necessary to complete project. 20. The Prospective Contractor shall prevent unnecessary damage to any part of surrounding buildings. 21. The Prospective Contractor shall remove all debris, including nails and metals, and all disposable materials offsite at the end of each workday. 22. The Prospective Contractor shall work during normal business hours. 23. The Prospective Contractor shall schedule all work with park officials. 24. The Prospective Contractor shall provide all necessary Taxes and Freight. 25. The Prospective Contractor shall provide one (1) year warranty that applies to all work performed. . The Prospective Contractor shall furnish Workmen's Compensation, General Liability Insurance, and Vehicle Insurance Certificates to ADPHT prior to a resulting contract. 27. The Prospective Contractor shall be responsible for all materials deliveries and protection of during construction. 28. Final inspection to be conducted by Travis McClure or his designee. 29. Any discovered damage must be reported to park representative in writing and must be submitted to ADPHT Central Office Buyer, prior to any repair work being completed, for approval and any adjustment to the purchase order. Information regarding the repair should include all labor, materials, and cost. REQUIRED SITE VISIT: A. The Prospective Contractor shall make a site visit with Park Superintendent or his designee. B. The Prospective Contractor shall meet with the Park Superintendent or his designee at the Visitor Center at the park. . The Prospective Contractor shall bring site verification form to the site visit to have park personnel conducting the site visit to sign after completion of the site visit. The signed site visit verification form must be submitted with the Prospective Contractor's bid response. E. The Prospective Contractor shall arrive no later than ten (10) minutes prior to the actual start time of the site visit. F. The Prospective Contractor and/or their representatives present and participating in the required site visit will be given the opportunity to ask questions during site visit. Although answers will be provided as a courtesy to all Prospective Contractors in attendance, no oral responses provided by ADPHT personnel to any question posed at the required site visit will become part of a contract resulting from this solicitation unless the oral response provided is reduced to writing and attached as an addendum to this solicitation
Post-Bid
Playgrounds / Parks / Athletic Fields
$125,000.00
Public - State/Provincial
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 7, 2023
October 9, 2023
1200 Catherine Park Rd, Hot Springs, AR
Related To This Project
Hot Springs, AR
Bid Date: Sep 18 2023
Hot Springs, AR
--
Hot Springs, AR
Bid Date: Nov 30 2021
Hot Springs, AR
Bid Date: Feb 16 2022
Hot Springs, AR
Bid Date: Feb 18 2022
Hot Springs, AR
Bid Date: Feb 25 2022
Hot Springs, AR
Bid Date: Feb 25 2022
Hot Springs, AR
Bid Date: Feb 25 2022
Hot Springs, AR
--
Hot Springs, AR
Bid Date: Apr 07 2021
Hot Springs, AR
--
Hot Springs, AR
Bid Date: Oct 26 2023
Hot Springs, AR
Bid Date: Apr 28 2021
Hot Springs, AR
Bid Date: Oct 12 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.