Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a military facility in Brunswick, Georgia. Completed plans call for the renovation of a military facility.
Award Details Contract Award Date: Sep 13, 2023 Contract Award Number: 70LGLY23PSSB00045 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: UPFFKCA44L49 Contractor Awarded Name: OMEGATECH COMMUNICATION SERVICES LLC Contractor Awarded Address: Palm Bay, FL 32907 USA Base and All Options Value (Total Contract Value): $27,689.29 All questions from contract holders regarding this task order request shall be submitted via email no later than 08/25/2023 to john.g.bennett@fletc.dhs.gov Statement of Work For Install Fiber Optic Cable for Danis City Expansion Phase II at Glynco, GA 1. Background This Statement of Work (SOW) establishes and defines the requirements for the engineering, furnishing, installation, testing and documentation of inside and outside plant fiber optic and copper cabling at Glynco, GA. 2. of Work The contractor shall provide all personnel, equipment, tools, materials, supervision, and all other components necessary to install, test and document inside and outside plant fiber optic and copper cabling at Glynco, GA. All work performed in the design and installation shall conform to BICSI (Building Industry Consulting Services International) specifications to ensure consistency with current codes, standards, and regulations. The following BICSI publications apply. Outside Plant Design Reference Manual, 4th Edition and Telecommunications Distribution Methods Manual, 12th edition. 3. General. 3.1. Cable Testing. All copper cables will be tested in accordance with BICSI specifications to ensure no damage has occurred to the cable during installation. All copper cables shall be tested for cable faults prior to and after installation has been completed. If the cable is damaged during installation, the contractor shall replace the cable with one that is undamaged. All cable terminals and information boxes interface units shall be labeled with machine-generated labels. All cables shall be labeled at all termination points, building entrance terminals, patch panels, manholes, hand holes, and at all splice entrance/exit points. 3.2. Restoration. All non-paved surfaces (grass, sod, gravel, etc.) must be restored within 7 days. Trenches and splice pits must be mechanically compacted to compensate for future earth settlement. All roads, streets, sidewalks of concrete or asphalt construction must be restored or repaved within 3 days from the time of backfilling and compaction. 3.3. Grounding. Contractor shall ensure all equipment are secured and grounded to industry standards. 4. Description of Task 4.1 Task 1: Materials To Install Fiber Optic Cable for Danis City Expansion Phase II at Glynco, GA 4.1.1. List of materials to be provided by the contractor. 4.1.2. Approximately 4000" of 12 Strand SM Fiber Cable OSP Dielectric 4.1.3. Approximately 4000" of Six Pair, 24 AWG OSP Copper Cable 4.1.4. Four (4) 1U Fiber Shelf (2 Panel) 24/SC or 48LC Patch Panels 4.1.5. Twenty-Four (2$ SC SM Fiber Connector - Hotmelt 4.1.6. Four (4) Fan Out Kit 12 Fiber 4.1.7. Four (4) Bldg. Entrance Protector 06 Pair 4.1.8. #6 AWG Copper Grounding Wire 4.1.9. Cable Tags 4.1.10. Other Materials as needed. 4.2 Task 2: Install Fiber Optic Cable for Danis City Expansion Phase II at Glynco, GA 4.2.1 Contractor shall provide and install approximately 2000' of 12 Strand Singlemode Fiber Optic Cable from the Telco Closet of Building 813 (Federal Building) and the new Training Warehouse building's Telco Closet. Using existing hand hole and conduits system. 4.2.2 Fiber Patch Panel using SC-Type Fiber Connectors at both building 813 and the new training warehouse. 4.2.3 Contractor shall provide and install approximately 2000" of 6 pair OSP Copper cable between the IT closet of building 813 and the new training warehouse building's IT closet, using the existing hand hole and conduit system. 4.2.4 Contractor shall terminate the 6 pair copper cable onto the building entrance protector terminals in the main Telco closet of building 813 and the traini9ng warehouse IT closet. 4.2.5 Contractor shall provide and install approximately 2000' of 12 Strand Singlemode Fiber Optic Cable from the Telco Closet of Building 813 (Federal Building) and the new Retail Store Training building's Telco Closet. Using existing hand hole and conduits system. 4.2.6 Contractor shall terminate the 12 Strand Single Mode Fiber onto the 1 U Fiber Patch Panel using SC-Type Fiber Connectors at both building 813 and the new retail store facility. 4.2.7 Contractor shall provide and install approximately 2000" of 6 pair OSP Copper cable between the IT closet of building 813 and the new Retail Store Training building's Telco Closet, using the existing hand hole and conduit system. 4.2.8 Contractor shall terminate the 6 pair copper cable onto the building entrance protector terminals in the main Telco closet of building 813 and the new retail training facility's IT closet. 4.2.9 Contractor shall ground and label the cable and terminal. 4.2.10 Contractor shall test the cables and provide results to FLETC upon completion. 5 Deliverables 5.2 Equipment 5.3 All equipment identified in 0.1 6 Documents Item identified in Task 1 and 2 7 Period of . Period of for this contract is not to exceed 90 days from contract award date. 8 Contract Type This contract shall be a firm fixed price contract. 9 Place of All Tasks work shall be performed at the Federal Law Enforcement Training Centers; US Department of Homeland Security; 1131 Chapel Crossing Road, Glynco, GA 31524. 10 Section 508 Requirements (include in the SOW, PWS, or SOO) Section 508 of the Rehabilitation Act (classified to 29 U.S.C. 794d) requires that when Federal agencies develop, procure, maintain, or use information and communications technology (ICT), it shall be accessible to people with disabilities. Federal employees and members of the public with disabilities must be afforded access to and use of information and data comparable to that of Federal employees and members of the public without disabilities. All products, platforms and services delivered as part of this work statement that, by definition, are deemed ICT shall conform to the revised regulatory implementation of Section 508 Standards, which are located at 36 C.F.R. 1194.1 & Appendixes A, C & D, and available at https://www.ecfr.gov/cgibin/ text-xSID=e1c6735e25593339a9db63534259d8ec&mc=true&node=pt36.3.1194&rgn=div5. In the revised regulation, ICT replaced the term electronic and information technology (EIT) used in the original 508 standards. ICT includes IT and other equipment. Exceptions for this work statement have been determined by DHS and only the exceptions described herein may be applied. Any request for additional exceptions shall be sent to the Contracting Officer and a will be made according to DHS Directive 139-05, Office of Accessible Systems and Technology, dated November 12, 2018, and DHS Instruction 139-05-001, Managing the Accessible Systems and Technology Program, dated November 20, 2018, or any successor publication.
Award
Military
$27,689.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 7, 2023
October 9, 2023
1131 Chapel Crossing Rd, Brunswick, GA
Related To This Project
Brunswick, GA
Bid Date: Aug 28 2023
Brunswick, GA
--
Brunswick, GA
--
Brunswick, GA
Bid Date: Sep 13 2023
Brunswick, GA
Bid Date: Sep 11 2023
Brunswick, GA
Bid Date: Sep 21 2023
Brunswick, GA
Bid Date: Nov 23 2021
Brunswick, GA
Bid Date: Jan 13 2022
Brunswick, GA
--
Brunswick, GA
--
Brunswick, GA
Bid Date: Sep 13 2023
Brunswick, GA
Bid Date: Aug 16 2023
Brunswick, GA
Bid Date: Sep 01 2023
Brunswick, GA
Bid Date: Sep 05 2023
Brunswick, GA
Bid Date: Sep 04 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.