BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 29, 2026 at 7:00 PM

Updated January 30, 2026

Site work for a mixed-use development in Saint John, New Brunswick. Design plans call for site work for a municipal facility; and water / sewer project.

Raising of the Courtney Bay Causeway and construction of a new pumping station. TIMELINE: Project is conceptual. Funding has been allocated in the 2026 General Fund Capital Budget, however it is contingent on signing a DMAF funding agreement. Further update summer 2026. Project funding is being made available through the Disaster Mitigation and Adaptation Fund (DMAF).

Design

Water / Sewer

$1,728,177.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
33
Bidding Soon
362
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2027

Project location map

Courtenay Bay Causeway, Saint John, NB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.