BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Maryville, Tennessee. Completed plans call for site work for a playground / park / athletic field.

A. Work included 1. Work includes seeding, sprigging, sodding, and associated maintenance operations through project acceptance as indicated on plans and specified herein. 2. Provide all labor, materials, and equipment necessary to perform the seeding, sprigging, and / or sodding work, complete, as indicated on the Drawings and as specified. 3. Prior to beginning work onsite, all subcontractors must read and sign the latest copy of the Storm Water Pollution Prevention Plan (SWPPP). Subcontractors must adhere to all requirements of the SWPPP. It is the intent of this Invitation to Bid (ITB) to procure a contract for construction, site clearing, irrigation, turf, and athletic equipment for Heritage Middle School practice baseball field. Question Deadline 10/18/2023 at 5:00 PM ET QA date changed from 10/13/2023 as per spec questions are due and are to be put in the Online Bidding Systems "Questions" tab before the close of business. A. In all cases, if permanent erosion resistant measures have been installed temporary preventive measures are not required. B. Construction Entrances: Traffic-bearing aggregate surface. 1. Width: As required; 20 feet (7 m), minimum. 2. Length: 50 feet (16 m), minimum. 3. Provide at each construction entrance from public right-of-way. 4. Where necessary to prevent tracking of mud onto right-of-way, provide wheel washing area out of direct traffic lane, with drain into sediment trap or basin. C. Linear Sediment Barriers: Made of silt fences. 1. Provide linear sediment barriers: a. In accordance with erosion control plans and along downhill perimeter edge of disturbed areas, including soil stockpiles. b. Along the toe of cut slopes and fill slopes. c. Perpendicular to flow across the bottom of existing and new drainage channels and swales that traverse disturbed areas or carry runoff from disturbed areas; space at maximum of 200 feet apart (at maximum of 60 m apart). 2. Space sediment barriers with the following maximum slope length upslope from barrier: a. Slope of Less Than 2 Percent: 100 feet (30 m).. b. Slope Between 2 and 5 Percent: 75 feet (23 m). c. Slope Between 5 and 10 Percent: 50 feet (15 m). d. Slope Between 10 and 20 Percent: 25 feet (7.5 m). e. Slope Over 20 Percent: 15 feet (4.5 m). D. Soil Stockpiles: Protect using one of the following measures: 1. Cover with polyethylene film, secured by placing soil on outer edges. 2. Cover with mulch at least 4 inches (100 mm) thickness of pine needles, sawdust, bark, wood chips, or shredded leaves, or 6 inches (150 mm) of straw or hay. E. Mulching: Use only for areas that may be subjected to erosion for less than 6 months. F. Temporary Seeding: Use where temporary vegetated cover is required.

Award

Playgrounds / Parks / Athletic Fields

$208,216.00

Public - County

Site Work

16

13

2

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
141
Active Projects
98
Bidding Soon
889
All Active Projects
394
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 24, 2023

November 23, 2023

img_map_placeholder

3737 E Lamar Alexander Pkwy, Maryville, TN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.