Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a sidewalk / parking lot in Minneapolis, Minnesota. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
894NRM21002: Replace Walk Area, ADA Plates and Curb Island, Fort Snelling National Cemetery The Contractor shall provide all Management, Supervision, Labor, Equipment, Materials, Parts, Tools, etc., required and necessary to provide complete construction services to fully Replace Walk Area, ADA Plates and Curb Island at Fort Snelling National Cemetery, and all other work necessary to complete the work as described herein. A.5 STATEMENT OF WORK The Contractor shall provide all Management, Supervision, Labor, Equipment, Materials, Parts, Tools, etc., required, and necessary to provide complete construction services to fully Replace Walk Area, ADA Plates and Curb Island at Fort Snelling National Cemetery, and all other work necessary to complete the work as described herein. Contractor shall inspect the grounds where the work is to be completed and ascertain the work deemed necessary and required to complete the work outlined herein, failure of the Contractor to fully inspect grounds prior to performing the work shall not relieve the Contractor from performing in accordance with the strict intent and meaning of the specifications without additional cost to the Government. The work will consist of but will not be limited to (not necessarily in the order indicated) the removal and replacement of two (2) Walk Area; the removal and replacement of the ADA Detectable Warning Panels; as well as the removal and replacement of the Adjacent Concrete Curb Islands; and also the Installation of six (6) new Bollards in an area adjacent to the columbariums; and the Inspection and testing to ensure proper compliance and functionality. The Contractor shall submit an After Inspection Report of Contractor s findings, listing any deficiencies found and recommendations, to the COR and Contracting Officer for review and approval prior to commencing the work. The report will include all aspects of the construction services needed to provide fully Replace Walk Area, ADA Plates and Curb Island at the Fort Snelling National Cemetery as specified herein. Prior to beginning any work, the Contractor shall survey the and review the Statement of Work to determine the extent of the work. The Contractor shall take all necessary precautions to avoid damages to existing items to remain in place, to be reused, or to remain the property of the Cemetery. Any damaged items shall be repaired or replaced as approved by the COR. The Contractor shall locate, tag, and identify any utilities irrigation system piping, sprinkler heads, and other components and make all necessary adjustment or connections from the existing utilities and shall reroute any utility line, which may impact construction. The Contractor shall grade the within the construction limits to maintain proper drainage; all ground surfaces shall be graded to provide runoff toward drains and/or swales. The Contractor shall repair and restore any damage to roads, turf or surrounding area that occurs during construction. TASKS Remove two (2) walk areas; each approximately 65 x 17 in area and each containing 18 linear feet of ADA detectable warning panels and each containing two (2) concrete curb landscape islands as well as depressed curb and gutter along the front of the ADA plates. Sawcut existing concrete, if necessary, to not damage existing surfaces which are to remain. The concrete walkway shall be replaced with new 5 thick concrete sidewalk with 4500 psi strength, low-chert, 6% air entrained, fiber mesh reinforcement. Haul, spread and compact 4 of DOT aggregate crushed stone base course. Base course will need to be properly compacted prior to placement of concrete. Provide a light broom finish as well as the required expansion joints (with urethane joint sealant) and saw cut contraction joints and apply one (1) coat of sealer. The depressed curb and gutter to be replaced shall match the profile, slope and dimensions of the existing curb and gutter being removed and shall also include the 4 of compacted aggregate base course as stated above. Remove the existing concrete and necessary sub-grade as needed to complete the project. The existing barrier curb islands shall be removed and replaced with B6.12 curb and gutter (Reverse Gutter Slope) along with the 4 of compacted aggregate base course as stated above. The concrete mix design shall be the same as the concrete walkway. Remove the existing concrete, landscape stone and necessary sub-grade as needed to complete the project. The ADA detectable warning panels shall be removed and replaced with new six (6) 24 x 36 plates for an overall length of 18 linear feet per area (2 areas). The new ADA plates shall be of the brand name ADA Solutions ( https://adatile.com/cast-in-place-replaceable/), or approved equal and shall be replaceable, composite and black in color. Procure and install six (6) Bollards to be positioned in the two (2) walk areas being removed and replaced (specific to be determined by the COR). The Bollards shall be of the brand name Vestil), or approved equal (https://www.vestil.com/product.phpFID=673) and must be identical to the Bollards already installed on the grounds for ease of repair and replacement. Contractor shall be responsible for traffic control and shall obtain, erect, maintain and remove signs, barricades, flagmen and other traffic control devices as may be required and necessary for the purpose of regulating, warning or guiding traffic. The route of construction traffic to and from the project worksite shall be clear of debris at all times as well as the required safety signage and barricades for the safe passage of visitors. Thoroughly clean up the work area at the end of each day and at the completion of the project, and always leave the premises clean and free of waste, scrap, used equipment or material delivered to the site by Contractor or Contractor s personnel. All work must be done in strict accordance with the manufacturer s requirements and installation guidelines. All materials and layout of site will be pre-approved by the COR before materials are ordered or work commences. TIL SPECIFICATIONS All work shall be performed In Accordance With (IAW) the National Cemetery Administration (NCA) Master Construction Specifications (MCS) as indicated in herein, inclusive of the attached, following VA TIL Specifications. Section 01 00 02 General Requirements Section 01 33 23 Shop Drawings Product Data and Samples Section 01 74 19 Construction Waste Management Section 03 30 53 Short Form Cast in Place Concrete Section 32 05 23 Cement and Concrete for Exterior Improvements All work shall be performed in a professional workmanship like manner. All adjacent disturbed surfaces shall be repaired to the same quality standards of the existing work and shall also match the adjacent areas. At the completion of the work and upon satisfactory acceptance by the Government, the Contractor shall provide to the COR and Contracting Officer any applicable Operation and Maintenance Manuals, a certificate of Warranty / Guarantee that all work done under the contract shall be free from defaults, faulty materials or workmanship for a minimum of one (1) year from the date of final acceptance. Contractor hereby agrees to repair or replace deficiencies within the specified time frame by the of the COR or Contracting Officer at Contractor's own expense and shall be corrected to the satisfaction of the Government. The work shall include full compliance with all related specifications requirements, including, but not limited to, the Contractor providing all requirements necessary permit(s). All work required to achieve these results shall be at the Contractor's expense with no additional costs to the Government. Note: See Attached Fort Snelling Map and Photos of Improvement Area and Existing Condition Photos INVESTIGATION INSPECTION Per FAR 52.236-3, Contractor should survey / inspect the prior to submitting a bid/proposal/quote in order to be fully aware of the of Services required and to adequately gather existing unit s product information, model numbers and all necessary and matching standards and requirements. Contractor shall perform a Investigation to verify the of all dimensions/measurements and conditions before start of the work or the ordering of any equipment, parts and or materials. Failure to do so shall not relieve the successful offeror from performing in accordance with the strict intent and meaning of the specifications without additional cost to the Government. Contractor shall submit an After Inspection Report of Contractor s findings, listing each respective Flagpole deficiencies found and repair/work solutions to the COR and Contracting Officer for review and approval prior to commencing the work. Any electrical work shall be in accordance with the latest edition of the National Electrical Code (NEC) and local building codes. Failure to do so shall not relieve the Contractor from performing in accordance with the strict intent and meaning of the specifications without additional cost to the Government. MATERIAL SUBMITTALS All submittals, samples, etc., called for by the specification requirements shall be approved by the COR and/or the Contracting Officer before any work associated with or required by said submittal, samples, etc., is to begin. The Contractor shall prepare and submit all submittals as specified in the contract or as requested by the COR and/or the Contracting Officer. Be advised and reminded that the COR cannot approve submittals that would result in a change to the contract terms or conditions, or that would affect a cost or time change; The Contracting Officer is the only person authorized to approve and issue supplemental agreements, change orders, stop order, modifications, payments, etc., on the Government behalf. The Contractor must acquire the COR s approval once materials has been approved to start the work. All work shall be performed in a professional workmanship like manner, adhere to VHA and NCA standards, be done in strict accordance with the requirements set forth herein, manufacturer s requirements, installation guidelines; and be in accordance with applicable Federal, State and Local codes and regulations; inclusive of applicable OSHA Construction Safety Guidelines. SPECIFICATIONS AND DRAWINGS DISCREPANCIES In the case of any differences between the Statement of Work, Specification and/or Drawings, the specifications will prevail and govern over the Statement of Work and/or Drawings. Any Statement of Work, Specification and/or Drawings discrepancies should be brought to the immediate attention of the Contracting Officer and COR for clarification. Any errors or omissions in the Statement of Work, Specification and/or Drawings must be provided promptly to the Contracting Officer and COR, but in no case later than the start of related work. CONSTRUCTION PROGRESS PHOTO DOCUMENTATION During the construction through completion, Contractor shall provide photographic documentation of construction progress and at selected milestones per the Contracting Officer and/or the COR. The photos shall meet the following qualifications: Photo elements: Digital image shall be taken with a professional grade camera with minimum size of 6 megapixels (MP) capable of producing 200x250mm (8 x 10 inch) prints with a minimum of 2272 x 1704 pixels and 400x500mm (16 x 20 inch) prints with a minimum 2592 x 1944 pixels. Before construction services work, the area, building, adjacent streets, roadways, parkways, driveways, curbs, sidewalks, landscaping, adjacent utilities and adjacent structures surrounding the shall be photo documented. Overlapping photographic techniques shall be used to ensure maximum coverage. If work or area preparation is extensive, this documentation may be required immediately before construction services work begins and at several pre-determined intervals during work commencement. Photography of employees, visitors, volunteers, and others on NCA premises is strictly prohibited. Photographing of NCA premises (buildings, grounds, property, ) is allowed ONLY with written permission from the COR. PERIOD OF The Contractor shall complete all work including submittals, reviews, quality control, repair/construction services, punch list corrections, clean up, invoicing and closeouts documentation submittal within ninety (90) calendar days of Government issuance of the Notice to Proceed. The Contractor shall develop and provide the Contracting Officer with a Project Schedule and Cost Schedule within ten (10) calendar days of Government issuance of the Notice to Proceed. WORK HOURS Normal construction services work hours for this project shall be 7:30 a.m. to 4:00 p.m., CST Monday through Friday, excluding Saturday, Sunday and Federal Holidays. Contractor work hours may be modified only by written approval of the Contracting Officer, at no additional cost to the Government. The Contractor shall coordinate with the COR to establish a work schedule and to ensure that no work is being performed at the immediate of a scheduled interment or ceremony. The Contractor shall be responsible for ensuring that no contract work causes any funeral, ceremony, procession or visitation to be delayed, altered, or otherwise impacted in such a way that the dignity or security of the event is compromised. The Contractor may request authorization in advance from the Contracting Officer to work outside of normal service hours at no additional cost to the Government. Written Authorization must be pre-approved in advance and prior to working and is at the sole discretion of the Contracting Officer. Contractor, Contractor s employees and sub-contractors must check-in with the COR, daily, upon arrival at the Fort Snelling National Cemetery prior to beginning any work and prior to departing the facility/property after the day s work is completed. XIII. HOLIDAYS The following federal holidays are observed: New Year's Day - January 1 Inauguration Day (DC Metropolitan Area Only) - January 20 every 4 years Martin Luther King's Birthday - 3rd Monday in January President's Day - 3rd Monday in February Memorial Day - Last Monday in May Juneteenth- June 19 Independence Day - July 4 Labor Day - 1st Monday in September Columbus Day - 2nd Monday in October Veterans Day - November 11 Thanksgiving Day - 4th Thursday in November Christmas Day - December 25 And any other holiday proclaimed by the President as a Federal Holiday. When a holiday falls on a Sunday, the following Monday will be observed as a legal holiday. When a holiday falls on a Saturday, the preceding Friday shall be observed as a holiday. CONTRACTOR QUALITY CONTROL The Contractor s Superintendent will: be on , at all times, whenever work is being performed by Contractor or subcontractors employees, to ensure adequately supervision and communication; review and approve submittals; inspect the quality of work performed; and certify the completed work for payment and other purposes. Note that there may be infrequent stoppages in work at the order of the Contracting Officers Representative (COR) due to burial services being conducted in the area. Contractor will meet with COR at the start of each workday to ensure that no construction activities will interfere with burials on that specific day. CONTRACTOR'S RESPONSIBILITIES The Contractor will be responsible for ensuring that all work is done in a manner that safeguards NCA visitors, employees, and the public. Contractor will be responsible for and obtain all necessary licenses and/or permits required to perform the work. Contractor shall take all precautions necessary to protect persons and property from injury or damage during the of this contract. Contractor shall be responsible for any injury to himself/herself, his/her employees, or others, as well as for any damage to personal or public property that occurs during the of this contract that is caused by him/her or his/her employees' fault or negligence. Contractor shall maintain personal liability and property damage insurance prescribed by the laws of the State of Minnesota. NATIONAL CEMETERY ADMINISTRATION DIGNITY STANDARDS Every action by contractor personnel at a National Cemetery must be performed with the special care, reverence, dignity, and respect that acknowledge the cemetery as the final resting place that commemorates the service and sacrifice those service members, Veterans, and their families made for our Nation. Critically important is the awareness, required of the contractor employees, of the remains buried in the grounds where the work is performed. The utmost care must be given to these remains and the headstones and flat grave markers that mark those gravesites and memorialize the service of individuals. Contractors cannot walk, stand, lean, sit or jump on headstones or markers. Nor can they drive over them. Contractor personnel should use tools approved by the Contracting Officer Representative (COR), such as shovels, pry bars or pinch bars to lift flat markers out of the ground; pickaxes are not an acceptable tool. No tools, equipment or other items will be placed or leaned on headstones or markers. Once headstones/markers are removed from the socket, do not place on dirt piles or mud; they should be carefully placed on each associated gravesite and protected in such a way as to prevent any soiling and be out of the way of any other work. Headstones shall be removed from their sockets using wooden and/or metal clamps. If metal clamps are used, the area that contacts the headstone must be protected with a rigid fabric that will prevent damage to and marking of the headstone. Clamps may be attached to a skid steer loader (i.e., BobcatA(R)) or similar machine to extract the headstone from the socket. When headstones are removed from their sockets, they shall be carefully stored on each associated gravesite; do not lean headstones against each other. Use care not to scratch or damage headstones in any manner. The headstones shall be laid with front inscription side up while the headstone is lying horizontally on the ground. The headstone shall be protected from direct ground contact while lying horizontally. The protection method shall be as approved by the COR and shall be free of deterioration in weather. An approved method is to support each headstone with two wood 4X4 s. Alternate methods can be approved. Cardboard shall not be used. Wood or other suitable appropriate and attractive material shall be used to keep the headstones from contact with the soil while lying horizontally during the construction period. This also shows respect towards the families visiting the gravesites and the remains that are buried. Contractor shall be responsible for replacing damaged headstones and markers and for restoring turf damaged during of this work. Additionally, should any activity result in the exposure and/or damage to any remains, container for remains (i.e., casket or urn), or outer burial container, the Contractor must contact the COR, Director/Assistant Director, and Contracting Officer (CO) for guidance. Any doubts as to proper procedures shall be brought to the attention of the COR, Director/Assistant Director, and CO for guidance or resolution. The Contractor is required to discuss the guidance with their employees and have each employee sign a statement of compliance and deliver the signed statement to the COR before work may begin. STANDARDS OF EMPLOYEE CONDUCT The National Cemetery Administration (NCA) are national shrines that honors Veterans with a final resting place and lasting memorials that commemorate their service to our Nation. The standards of work, appearance, and procedures performed by Contractors at National Cemeteries shall reflect this nation s concern for those interred there. Due to the sensitive mission of the cemetery, Contractor s personnel must exercise and exhibit absolute decorum, composure, and stability at all times. As the work being performed is at a National Cemetery all Contractor s employee must always look professional and neat in appearance; and be fully clothed to include upper garment to cover the body from the waist to neck and long pants or slacks. The Contractor shall require its employees, including subcontractors, to wear distinctive visible identification at all times for easy identification while on NCA premises. Contractor and Contractor s personnel (including subcontractor and their employees) shall be required to adhere to the standards of dress and conduct while performing work on the National Cemetery. These standards and regulations are enforceable under Title 38, U.S.C. Section 218. Contractor s personnel shall: be fully clothed at all times, to include long slacks or pants and shirt, buttoned up from neck to waist. Clothing will be clean each day. Any soiled clothing should be Cemetery work-related that day. Tank tops as outer garments are prohibited. Tee-shirts will have the company logo visibly displayed. Shoes/boots will have no holes or loose soles. Steel-toed shoes shall be required in accordance with OSHA. Contractor employees shall maintain personal hygiene. not engage in loud or boisterous behavior or use profane or abusive language. Shall show proper reverence during committal service. not eat or drink beverages except water or non-alcoholic drinks while in work area or in sight of committal service area during a service. Use of intoxicating beverages and/or drugs is strictly prohibited. not lean, sit or stand on or against headstones, markers, or monuments. No tools, equipment or other items will be placed or leaned on headstones or monuments at any time. Contractor personnel shall not drive over headstones, markers, or monuments. smoking is ONLY allowed at designed Smoking area identified by the cemetery. Smoking is not permitted inside any cemetery buildings. Smoking is not prohibited within twenty-five feet from Entrances, Exits, Operable Windows, and Ventilation intakes that serve an enclosed area(s). Only smoke in smoking areas, as designated by the COR. All other areas are designated as NO SMOKING. Contractor must discuss the guidance in this paragraph with its employees and all subcontractors. Any doubts as to proper procedures shall be brought to the attention of the COR and Contracting Officer for guidance or resolution. Contractor and subcontractor employee shall sign a Statement of Compliance (if applicable); and shall deliver the signed statements to the COR before work may begin or before any new employee is allowed to work on Cemetery grounds. Contractor shall be responsible for maintaining satisfactory standards of personnel conduct and work and shall administer disciplinary action as required. Contractor is expected to remove any employees from the Cemetery for cause, to include, but not limited to, safety violations, other misconduct in of duty under these specifications and/or conduct contrary to the best interests of the Government. If the Contractor fails to act in this regard, or the reason for a removal is immediately required to protect the interests of the Government, the COR may direct the removal of an employee from the premises. Contractor s objections to any such action will be referred to the Contacting Officer for final resolution; however, the Contractor will first immediately comply with the COR s pending the Contacting Officer final resolution at a later time or date. The Contractor will not be due any type of compensation for their costs incurred as a result of an employee being removed for cause; unless the removal is directed by the COR and is later found invalid and/or unreasonable by the Contracting Officer. USE OF CEMETERY FACILITIES The Government will not be responsible for any loss, damage, or theft of Contractor items, nor will free telephone service be provided. Contractor shall be responsible for acceptable standards of housekeeping and custodial maintenance of both National Cemetery Administration facilities and Contractor-installed facilities used by the Contractor's employees. The Government will NOT furnish a storage building or area at the Cemetery for use by the Contractor to store supplies and equipment. Contractor shall be responsible and required to provide and remove the material, equipment, tools and supplies to perform operations daily. The Government will NOT furnish a rest room facility to include temporary port-o-pots and will not be allowed on the grounds. Any hazardous substance that is used and which is a standard practice within the cemetery industry must be handled, stored, and transferred in accordance with all Occupational Safety and Health Administration (OSHA), Environment Protection Agency (EPA), and Department of Transportation (DOT) laws, regulations, and recommendations. The Contractor will be responsible for safely storing any chemicals, pesticides, herbicides, cleaning solutions, etc. in accordance with manufacturers recommendations. SDS (Safety Data Sheet) is required for any/all chemicals, pesticides, herbicides and cleaning solutions. Electricity, water and phone services will NOT be furnished by the Government for the Contractor s. CONSTRUCTION DURING CEMETERY FUNCTIONS The burial activities at a National Cemetery will take precedence over other contract activities. Contractor shall cooperate and coordinate with the COR or authorized designee, in arranging schedule to cause the least possible interference with cemetery activities in actual burial areas. The COR or a representative shall furnish the Contractor with a schedule of all interments and/or ceremonies no later than the close of business of the day prior to the scheduled event. Work noise during the interment services shall not disturb the service. Trucks and workmen shall not pass through the service area during this period. Contractor personnel shall not operate motorized equipment or conduct other commercial activities during interment services. Execute work in such a manner as to interfere as little as possible with work being done by others. To minimize contract activity interference with flow of cemetery traffic, keep roads, walks and entrances to grounds, parking and occupied areas of buildings clear of materials, debris and standing equipment/vehicles at all times. At least one (1) lane must be open to traffic at all times. Due to the sensitive mission of the Cemetery, the work could occasionally involve contact with and/or exposure to grieving individuals. Contractor personnel shall exercise and exhibit absolute decorum, composure and stability at all times and refer such individuals to Cemetery staff. HISTORIC PRESERVATION When the Contractor or any of the Contractor's employees, prior to, or during the service work, are advised of or discover any possible archeological, historical and/or cultural resources, the Contractor shall immediately notify the COR verbally, and then with a written follow up. AUTHORITIES OF GOVERNMENT PERSONNEL Notwithstanding the Contractor s responsibility for total management during the of this contract, the administration of the contract will require maximum coordination between the Government and the Contractor. The Government will provide, at the time of contract award, a list of Government personnel authorized to act as CORs. EXPOSURE OR ACCIDENTAL DISCOVERY OF REMAINS Should any on- activity, incident, emergency, or disaster result in exposure and/or damage to any remains, container for remains (i.e., casket or urn), or outer burial container, the Contractor shall IMMEDIATELY notify the Cemetery Director, the COR and/or the CO; take immediate steps to protect and render safe any exposed remains; and stop any further work that could affect those remains or grave until the Cemetery Director provides the Contractor guidance regarding disposition of the remains and permission to proceed. GENERAL Contractor shall NOT mobilize on until all Kick-Off , Documentation and Submittals have been submitted, reviewed and accepted by the NCA. The Contracting Officer shall provide written notification approval to mobilize. WORK ENVIRONMENT AND WEATHER CONDITIONS All work under this service Contract will be performed outdoors and personnel performing these services will be exposed to wind, heat, sun, cold, dampness, frost, fog, and rain. These conditions, may, at times, be extreme. The Contractor shall take all necessary precautions to protect his/her employees from the elements to the maximum practicable extent. Weather will not be considered an excusable delay in specifications or project schedule. The Contractor understands that it may be necessary to work throughout all weather conditions and to apply additional labor and equipment as necessary to meet deadlines, at no additional cost to the Government. If weather conditions are such that the work performed may cause more damage to the Cemetery grounds than good, the COR has the authority to stop work until conditions improve and the COR directs continuation of . If adverse weather conditions are the basis for a Claim for additional time, such Claim shall be documented by data substantiating that weather conditions were abnormal for the period of time, could not have been reasonably anticipated and had an adverse effect on the scheduled construction. OPERATIONS It is understood the Government will not be held responsible for any damage to or loss of the Contractor s equipment, materials, supplies or the like which may result from vandalism, theft etc. while on . The Contractor shall be responsible for maintaining fire extinguishers and other safety equipment. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's . All utilities to this area are the responsibility of the Contractor. Electrical power is to be supplied by either a Contractor-owned generator or by the local power company. Secondary service runs and the cost of power are the Contractor s responsibility. The Contractor would then be responsible for delivering and removing all necessary equipment and supplies daily. DISPOSAL AND RETENTION The Contractor shall be responsible for cleaning cemetery structures, headstones/flat makers, monuments, and roadways that are soiled or stained as a result of Contractor s . The Contractor shall wash-down with water all soiled or stained structures headstones/flat markers, and monuments at the end of each workday Any such washing/cleaning shall be brought to the immediate attention of the COR prior to washing/cleaning. At the end of each workday the Contractor shall properly remove and dispose all debris from the Cemetery resulting from the work. The Contractor shall always ensure that rubbish and trash generated by the Contractor is kept clear of vehicular and pedestrian traffic throughout the . The Government will not provide receptacle(s) for disposal of debris related to this contract. The Contractor shall provide its own means of removing debris. The Contractor shall dispose of all debris and other waste materials at a licensed off- landfill unless otherwise directed by the COR. The Contractor shall haul away and dispose of all waste in accordance with the Resource Conservation and Recovery Act (RCRA) and all other applicable Federal, State, and Local law and regulations. On-installation storage or disposal of hazardous waste is NOT allowed. At the completion of the project the Contractors shall be responsible for properly removing and disposing of all debris from Government property. All debris and packaging shall be properly removed and disposed of by the Contractor to an approved offsite disposal site or recycling center in compliance with State and Local ordinances. PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS Restore any areas disturbed in of this contract which may require restoration (as deemed appropriate by the COR); and will be deemed incidental to the contract. Areas outside of the construction limits impacted by operations of the contract shall be returned to the state it was found prior to the construction services. All adjacent disturbed surfaces shall be repaired to the same quality standards of the existing work and shall also match the adjacent areas. Damage to Government property: The Contractor (including Contractor s employees, subcontractors, consultants or the like) shall be responsible for repair or replacement of any Contractor damaged cemetery structure, to include: turf, curb, road pavement, headstones or markers, valve boxes, grid monument control markers, trees, plant beds, etc., which are chipped, marred, damaged and/or ruined at the fault of the Contractor. The Contractor shall bear all costs associated with replacement and reinstallation. All adjacent disturbed surfaces shall be repaired to the same quality standards of the existing work and shall also match the adjacent areas. Any such damage shall be brought to the immediate attention of the COR prior to repair, replacement, or installation. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work that are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so by the COR and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract , or by the careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and remove and properly dispose of from the as defined herein. The Contractor shall protect from damage all existing improvements and utilities at or near the work and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall immediately notify the COR of any such occurrence and repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor. Protection of Existing Utilities: Contractor shall be responsible for damages to utilities, above and below ground. RESTORATION Contractor shall remove, cut, alter, replace, patch and repair existing work as necessary. Except as otherwise shown or specified, do not disturb any water, steam, gas, or electric services without prior approval of the COR or Contracting Officer. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work shall conform in type and quality to that of original construction, except as otherwise shown or specified. Upon completion of the contract work any existing cemetery features (lawns, paving, roads, and walks) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work. All restoration work shall be accomplished without undue delay. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workmen/subcontractors to existing cemetery infrastructure. USE OF ROADWAYS The Contractor will be responsible for traffic control and shall obtain, erect, maintain and remove all signs, barricades, flagmen and other traffic control devices as may be necessary for the purpose of regulating, warning or guiding traffic. All traffic control protection will be considered incidental to the cost of the contract. The Contractor shall, under regulations prescribed by the Contracting Officer or COR, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the COR or Contracting Officer. The route of construction traffic to and from the project shall be clear of debris at all times as well as the required safety signage and barricades for the safe passage of visitors. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, or similar construction the Contractor shall protect them from damage by well-constructed bridges. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads. AVAILABILITY AND USE OF UTILITY SERVICES Water: A water system is not available. The Contractor shall provide and utilize portable water when needed. Electricity: In case the Contractor requires electricity while in of this Contract, the Contractor shall provide and utilize portable generators as necessary to complete the work. WORK PERFORMED ON BY OTHERS The Government may undertake or award other contracts for additional work at or near the of work for this contract. The Contractor shall fully cooperate with any other contractors and with Government employees and shall carefully adapt scheduling and of work, and needing any , it shall be provided by the COR. The Contractor s Superintendent shall be responsible for reporting to the COR any problems or questions that may arise with any other personnel on during the period of of this contract. The Contractor s Superintendent shall not take it upon him or herself to resolve any problems or issues with other on- Contractors or employees, but rather will leave it to the COR to resolve the issue. REPORTING AND RECORD KEEPING Contractor s Superintendent shall report on a daily basis to the COR at the Cemetery and log in. This DAILY check-in is and shall be at a time agreed upon by the COR and the Contractor s Superintendent within the requirements of paragraph b below. A list of scheduled ceremonies will be provided to the Contractor s Superintendent the week prior to the scheduled events, and a list of scheduled committal services will be provided daily. Contractor s Superintendent shall be solely responsible for ensuring that no contract work causes any committal service, ceremony, procession or visitation to be delayed, altered, or otherwise impacted in such a way that the dignity or security of the event is compromised. The Contractor shall be solely responsible for staying abreast of all such upcoming events and when in doubt, Contractor must ask the COR. CONTRACTOR-FURNISHED ITEMS Contractor shall be responsible for supplying all equipment, personnel, tools, supplies and materials necessary to perform the services required by this contract. Contractor-furnished items necessary to perform work as required under this contract shall be furnished, maintained and operated by the contractor and shall be consistent and fully compliant with all applicable OSHA, Federal, State, County, City laws, ordinances and regulations. Contractor shall be responsible for the supply, maintenance and repair of all Contractor-owned equipment. This includes minor maintenance/repair and minor operating parts for equipment such as lubrication, oil changes, spark plugs, gaskets, cotter pins/keys, electric extension cords, etc., to keep all equipment in good operational condition throughout the period of of this contract. No Contractor equipment maintenance repairs of any kind can be done on Cemetery property without the COR(s) approval. Contractor shall be responsible for ensuring that all his/her motor vehicles and equipment meet State inspection, safety, licensing, registration, and insurance requirements. Only Contractor equipment and supplies (property) required to perform work under this contract shall be used on cemetery property. No personal property, equipment, or vehicles shall be staged on the cemetery premises. GOVERNMENT S RESPONSIBILITIES Prior to Contractor mobilizing or commencing work, the COR will inform the Contractor of any known damages to the cemetery grounds, headstones/markers or any other areas that the Contractor is unaware of and not responsible for. In addition, prior to Contractor mobilizing or commencing work, a walk-through of the cemetery grounds shall be scheduled by the Government and Contractor, and will be attended by the COR, Contractor s Superintendent and/or Project Manager and any appropriate Contractor designated personnel. The NCA s PM Officer and Contracting Officer are optional attendee. The Government will not provide the Contractor with any equipment and materials storage, furnishings, fuel storage, equipment, materials, restrooms, or telephones. Utilities will be provided as defined in AVAILABILITY AND USE OF UTILITY SERVICES . Notification of Non-Compliance: The COR will notify the Contractor of any detected non-compliance with the foregoing requirements. The Contractor shall take immediate corrective action after receipt of such notice. Such notice, when delivered to the Contractor at the work , shall be deemed sufficient for the purpose of notification. If the Contractor fails or refuses to comply promptly, the Contracting Officer may issue an order ceasing all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to such cessation shall be made the subject of claim for extension of time for excess costs or damages by the Contractor. CLEANUP Contractor shall thoroughly clean up the work area at the end of each day s work and at the completion of the project. Contractor must remove and properly dispose of all debris, materials, equipment, and substances daily, at the end/completion of the work/job. Contractor shall leave the premises clean and free of waste, scrap, equipment or other material delivered to the by the Contractor or contractor s personnel. Contractor shall request authorization from the COR prior to disposing of any Government owned materials, equipment or property. Contractor shall properly remove and dispose all debris from government property. Disposal of debris, materials, equipment, and substances shall be in accordance with applicable Federal/State/local and environmental laws, rules and/or regulations. Contractor shall provide, if requested, shipping manifest and documentation of proper disposal of any debris, materials, equipment, and substances prior to final payment. Contractor shall ensure and provide appropriate documentation to the COR that all applicable hazardous waste, haulers, and disposal facilities are properly certified or licensed. The project shall be protected and/or restored to a condition equal to that existing prior to the commencement of work. PERSONAL PROTECTIVE EQUIPMENT Contractor shall provide Personal Protective Equipment (PPE), proper safety signage; and must provide and have in place: fire extinguishers, cones, barricades etc., to protect the safety of visitors, patients, employees and tenants. The Contractor shall not be permitted to work if the proper safety equipment/items are missing; and shall be asked to leave the area/facility. Additionally, COVID-19 safety protocols for Federal facilities remain in effect for all employees. SAFETY DATA SHEETS Contractor shall provide the COR with a copy of the Label of any product, material and/or chemical that is potential hazardous, as well as the Safety Data Sheets (SDS), before any such product, material and/or chemical is used. MATERIAL STORAGE There will be No on- office or on- storage/office container allowed. The Contractor shall provide just in time delivery and pickup . The Contractor shall coordinate with the COR for material storage/staging within the work area. The storage/staging of equipment, materials or supplies must have prior COR approval. Tools/Staging: Contractor shall provide its own required tools, ladders and equipment to complete the work. Operating vehicles/equipment: Contractors shall not leave operating vehicles/equipment unattended at any time and all shall ensure that vehicle/equipment keys are removed when not in operation. NOISE The Contractor / Contractor personnel shall not engage in loud or boisterous behavior, angry outbursts or use profane or abusive language at any time on Government property. The playing of loud music radios and/or electronic games/devices is not permitted. Two-way communications radios shall be allowed where broadcast frequency is approved by the COR. Contractor shall coordinate and schedule any noise making activities with the COR. For any noise making work activities, the Contractor must provide written notification to the COR and the COR will schedule and provide written authorization to proceed within three (3) business days in advance of the proposed activity. FIRE-SEAL If applicable, Contractor shall fire-seal all penetrations through any wall or floor with UL-Listed fire rated assemblies or materials. FUMES Any fume producing activities shall be scheduled after regular business hours unless written permission has been granted by the COR. The Contractor shall be responsible for all ventilation necessary to evacuate and prevent fumes from entering the building(s). HOT WORK PERMIT Any work or operation involving open flame or producing heat and/or sparks, (burning, welding or similar operation) that is capable of initiating fires or explosions will require a Hot Work Permit . The Contractor shall request a Hot Work Permit from the COR, a minimum of one (1) business day prior to the work activity. This work shall include, but shall not be limited to, processes such as arc welding, oxy-fuel gas welding, open- flame soldering, brazing, thermal spraying, oxygen cutting, arc cutting, chipping, grinding, heat treating, sand blasting, torch-applied roofing, chemical welding and light horizontal welding. CONSTRUCTION SAFETY Contractor shall ensure that all onsite construction workers (including subcontractors) have completed the OSHA 10-hour Construction Safety training or the 30-hour Construction Safety training (for supervisor and/or managers), and other relevant competency training. Contractor shall provide verification of such training to the Contracting Officer and the COR prior to mobilizing and at any time requested during the course of the work, until the contract is completed. SECURITY & SAFETY Contractor, Contractor s employees and sub-contractors shall follow all VA Policies, Standard Operating Procedures, applicable Laws and Regulations while on VA property. Violations of VA Policies, Standard Operating Procedures, applicable Laws and Regulations may result in citation and disciplinary measures for persons violating the VA Policies, Standard Operating Procedures, applicable Laws and Regulations. Contractor, Contractor s employees and sub-contractors shall take all reasonable precautions necessary to protect persons and property from injury or damage during the of this contract. Contractor, Contractor s employees and sub-contractors shall comply with VA Security Management program. Contractor shall not employ any person who is an employee of the United States Government if that employment would appear to cause a Conflict of Interest. Possession of weapons of any kind is prohibited on VA property; violators will be subject to fines or imprisonment under 18 U.S. Code A 930 - Possession of firearms and dangerous weapons in Federal facilities. Any provision or partial provision of this notice that is not consistent with the contract specifications shall be null and void only to the extent of the inconsistency; all other provisions or partial provisions of this notice shall remain in full force and effect. Contractor, Contractor s employees and sub-contractors shall comply with all -specific requirements and Standard Operating Procedures (SOP s) including but not limited to: Rules of Behavior, and Smoking Policy. Contractor, Contractor s employees and sub-contractors shall follow all VA policies, standard operating procedures, applicable laws and regulations while on VA property. Violations of VA regulations and policies may result in citation and disciplinary measures for persons violating the law. COVID-19 safety protocols for Federal facilities remain in effect for all employees. (End of Statement of Work) All questions regarding this solicitation must be submitted in writing (email is acceptable) to: Claude Humphrey (claude.humphrey@va.gov. Any prospective bidder desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing. No phone responses will be accepted. NOTE: All questions must reference the Solicitation number, Project number (if applicable) and the Description of the project in the Header or Opening Statement. The Product / Service Code is Z2PZ - Repair or Alteration of Other Non-Building Facilities The North American Industry Classification System code is 238110 - Poured Concrete Foundation and Structure Contractors. The Size Standard for this procurement is $19 million dollars. The of Construction range for this procurement is estimated to be between $100,000 and $250,000. All Requests for Information (RFI) must be sent in writing to the Contracting Officer. See section A.3 8 QUESTIONS *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Sidewalks / Parking Lot
$250,000.00
Public - Federal
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
10
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 22, 2023
October 23, 2023
7601 34th Ave S, Minneapolis, MN
Related To This Project
Minneapolis, MN
--
Minneapolis, MN
--
Minneapolis, MN
Bid Date: Sep 13 2023
Minneapolis, MN
--
Minneapolis, MN
Bid Date: Sep 08 2023
Minneapolis, MN
Bid Date: Aug 30 2023
Minneapolis, MN
Bid Date: Sep 12 2023
Minneapolis, MN
Bid Date: Sep 28 2023
Minneapolis, MN
Bid Date: Aug 31 2023
Minneapolis, MN
Bid Date: Sep 05 2023
Minneapolis, MN
Bid Date: Sep 05 2023
Minneapolis, MN
Bid Date: Aug 31 2023
Minneapolis, MN
Bid Date: Sep 20 2023
Minneapolis, MN
Bid Date: Sep 14 2023
Minneapolis, MN
Bid Date: Sep 13 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.