BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Beale AFB, California. Completed plans call for site work for a water / sewer project.

General Scope. 9th CES/CEOR is seeking contractor to install at grade manways and waterproof covers to prohibit rainwater and ground water from entering the Underground Storage Tanks (UST) sumps. Additionally, all technicians furnished by the contractor shall be individually certified and hold applicable International Code Council (ICC) certificates. the contractor will provide and install ALL components to execute the scope of work as follows: a. Prior to work execution, contractor shall coordinate fuel/power outages with the 9th Force Support Squadron and the 9th Civil Engineer Squadron as necessary. b. Contractor shall provide catch controls around work site to prevent erosion of materials into adjacent creeks. c. Any and all soil WILL be tested by the contractor prior to disposal or reuse. d. Saw cut six (6) each 5-foot x 5-foot around the three turbine sumps and fill sumps; provide demo and hauling of concrete. e. Place #4 rebar 18" on center each way and pour back concrete as needed. f. Install OPW Sump Kits & Water Shroud, OPW spill buckets, and 71S0-410C OPW shut off valves, caps, swivel adapters and new at grade OPW Fiberlite series multiport manways. g. Install Bravo Snap Lock Top Hats and OPW Fiberlite series manways over turbine sumps. h. Provide Spill bucket testing and OPI inspections. i. Obtain UST Repair permit from CUPA & BAAQMD. Finally, the contractor shall provide applicable notifications to all regulatory agencies as required by law to perform afore mentioned compliance testing. B. Authorized Work. Work shall be accomplished in accordance with all contractually incorporated documents. Any work that is accomplished outside of the contractual documents, unless authorized by a contracting officer, is accomplished at the contractor's own risk. C. All work shall be accomplished between 0700-1700 Mon-Fri. D. All contractor vehicles must enter the base via the Wheatland Gate and shall be subject to inspection. All contractor personnel must obtain base passes or be listed on the Entry Access List (EAL) throughout duration of work performance. Any persons in the EAL are required to bring two (2) forms of identification or REAL ID in order to access the base. E. The contractor shall comply with all applicable Federal, State and local NEC construction standards. Current Air Force Occupational Safety and Health (AFOSH) standards and COVID-19 safety regulations also apply. F. Contractor shall be in compliance IAW all NFPA, AFI, UFC and ETL standards for fire safety. G. All metal and equipment recycling will be disposed of on base to the 9 CES Recycle yard, all other waste material is to be removed off base by the Contractor, POC: Shane Morris at 530- 634-0744 or shane.morris.5@us.af.mil. Contractor will practice good housekeeping during the project. Inquires are due by 12:00 noon PST, 29 August 2023 Inquiries and responses for this RFQ may be directed to the contract administrator via e-mail to SSgt Kyle Thacker at kyle.thacker@us.af.mil and Katherine Moe at katherine.moe@us.af.mil

Post-Bid

Water / Sewer

$2,000,000.00

Public - Federal

Site Work

3

5

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
19
Bidding Soon
757
All Active Projects
310
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 5, 2023

September 30, 2023

img_map_placeholder

To Be Determined, Beale AFB, CA


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.