EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 22, 2023 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Willingboro, New Jersey. Working plans call for site work for a water / sewer project.

Notice is hereby given that sealed bids will be received by the Township Clerk of the Township of Willingboro for "2022 Multi Location Storm Water Infrastructure Repairs" and will be opened and read in public at the Township of Willingboro Administrative Offices located at 1 Rev Dr Martin Luther King Jr Drive, Willingboro, New Jersey. The work includes the furnishing of all labor, material, and equipment necessary or required to complete all work set forth in these Specifications. Estimated quantities for the various sites are summarized as follows: 1 Mobilization ............................................................................................................................................ 1 LS 2 Excavation (Unclassified) ........................................................................................................................ 100 SY 3 HMA 9.5M64 Surface Course, 2" Thick ................................................................................................ 96 SY 4 HMA 19M64 Base Course, 4" Thick ...................................................................................................... 96 SY 5 DGA, 6" Thick ......................................................................................................................................... 96 SY 6 Concrete Rolled Curb (Remove and Replace, If and Where Directed) ................................................... 120 LF 7 Vertical Concrete Curb (Remove and Replace, If and Where directed) .................................................. 40 LF 8 Concrete Sidewalk, 4" Thick.................................................................................................................... 50 SY 9 Jet Clean and TV 15" RCP....................................................................................................................... 25 LF 10 Jet Clean and TV 18" RCP....................................................................................................................... 455 LF 11 Jet Clean and TV 24" RCP ...................................................................................................................... 719 LF 12 Jet Clean and TV 36" CMP (If & Where Directed) ................................................................................ 100 LF 13 Jet Clean and TV 48" CMP (If & Where Directed) ................................................................................ 100 LF 14 Heavy Root Clearing, 18" RCP ............................................................................................................... 430 LF 15 Install 15" CIPP Liner (If & Where Directed) ........................................................................................ 25 LF 16 Install 18" CIPP Liner (If & Where Directed ......................................................................................... 455 LF 17 Install 24" CIPP Liner (If & Where Directed) ........................................................................................ 719 LF 18 Install 36" CIPP Liner (If & Where Directed) ........................................................................................ 100 LF 19 Install 48" CIPP Liner (If & Where Directed)......................................................................................... 100 LF 20 Install 18" HDPE .................................................................................................................................... 85 LF 21 Install 48" HDPE .................................................................................................................................... 61 LF 22 Install End Cap, 18" CMP ....................................................................................................................... 1 UN 23 Repair & Parge Existing Inlet, 2' Depth................................................................................................... 3 UN 24 Manhole Modification for 48" HDPE...................................................................................................... 1 UN 25 Install New Type-B Inlet with New Frame, "ECO" Head, and Bicycle-Safe Grate ................................................................................................................................... 3 UN 26 Install Type-B Inlet Frame, "ECO" Head, and Bicycle-Safe Grate.......................................................... 5 UN 27 Install New Flared End Section ............................................................................................................... 1 UN 28 Rip Rap Stone, 4" Thick .......................................................................................................................... 10 SY 29 Tree Removal - 6" to 24" Dia .................................................................................................................. 4 UN Digital copies of the Bid Documents will be provided and may be obtained at no cost by contacting Pennoni Associates, Danielle Downs by email at ddownes@pennoni.com with acc to ABorstad@Pennoni. com. Should interested bidders not have the ability to handle electronic download sets, a set may be arranged to be sent by calling 856-547-0505. A Certified Check, Bid Bond or Cashier's Check drawn to the order of Willingboro Township for ten percent (10%) of the total amount bid, provided said security need not be more than $20,000.00. All bid guarantees shall be accompanied by an executed consent from an approved surety company, licensed to conduct business in the State of New Jersey, agreeing to furnish the required Performance, Payment and Maintenance Bond upon the award of contract. The signed Proposal forms and bid security must be delivered to the place on or before the hour named above. The accepted bidder must sign the contract within ten (10) days after the Notice of Award or forfeit his bid security. Bid securities will be returned to all but the three apparent lowest responsible bidders. Bidders are required to comply with the requirements of N.J.S.A 10:5-31 et seq. and N.J.A.C. 17:27. The right is reserved to reject any or all Proposals, in whole or in part, or to make awards to such bidder or bidders, who, in the judgment of the Township of Willingboro makes the most advantageous bid and to waive such informalities as may be permitted by law.

Final Planning

Water / Sewer

$5,000,000.00

Public - City

Site Work

7

11

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Maintenance Data, Warranties, Project Record Documents, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 27 - Communications

Division 27 - Communications

Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Earth Moving, Grading, Finish Grading, Excavation and Fill, Excavation, Dewatering, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Plugging, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Operation and Maintenance of Utilities, Storm Drainage Utilities, Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
477
Active Projects
292
Bidding Soon
4,563
All Active Projects
2,029
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 6, 2023

November 6, 2023

img_map_placeholder

Multiple Locations, Willingboro, NJ

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2022 Multi Location Storm Water Infrastructure Repairs

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.