BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 26, 2023 at 8:00 PM

Updated January 29, 2024

This is a service / maintenance or supply contract in Peace River, Alberta. Contact the soliciting agency for additional information.

To assist the Town of Peace River in achieving sustainable rate structures that adequately fund water and wastewater operations, capital costs, debt, and reserves with reasonable, fair, and equitable rates. To assist the Town of Peace River in achieving sustainable rate structures that adequately fund water and wastewater operations, capital costs, debt, and reserves with reasonable, fair, and equitable rates. 1. Provide a Financial Plan sufficient to satisfy the Town of Peace Rivers goal of full cost recovery and sustainable operations for the water and wastewater systems for a period of at least 10 years. Study Requirements: 1. The recommended rate structure shall be based on full cost of service and shall be sufficient to meet the short and long-term revenue requirements related to water and wastewater operating, capital expenditures and debt. 2. The study shall recommend rate structures that consider and make allowances for: a. Current and future cost of providing water and wastewater in accordance with current and anticipated standards and regulations. b. Growth estimates as established by the Town or other supporting documents. c. The Asset Management Plan and asset condition assessments for the supply, distribution, and treatment infrastructure. d. Funding requirements for all unfunded liabilities or other financial obligations required to be incorporated under Public Sector Accounting Standards. e. Best practices in the areas of debt management and other financial tools. f. Risk/uncertainty associated with revenue flows. g. Recommendations of amendments and/or alignment the current by-laws, policies, and practices to the proposed new Utility Rate Model. h. Other impacts or factors as identified. 3. Options for rate structures that is consistent with industry practices. 9 4. The benefits of moving away from the current rate structure shall document the impact on ratepayers. 5. Projected impacts that proposed rate structures will have on future consumption patterns and the resulting impact on the cost of providing services. 6. Provide strategies for implementing significant rate changes to reduce adverse impact on specific customer classes. 7. Justifications for any special classes of customers shall be adequately documented, including financial impacts. 8. The recommended rate structure shall result in no decrease to the stability of the current revenue streams. 9. The impacts of funding past and current depreciation should be incorporated into the rate structure and impacts detailed. 10. The recommended rate structure shall be easy to administer, understand and communicate to the end users. 11. Review of the Town's billing system to ensure the recommended rate structure can be easily implemented. If not, the costs to amend the systems must be documented and quantified. 12. The plan must include information on the projected financial information, which includes projected financial position, projected financial operations and projected cash flow. The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
3
Active Projects
1
Bidding Soon
52
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 14, 2024

Project location map

Multiple Locations, Peace River, AB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.