Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Peace River, Alberta. Contact the soliciting agency for additional information.
To assist the Town of Peace River in achieving sustainable rate structures that adequately fund water and wastewater operations, capital costs, debt, and reserves with reasonable, fair, and equitable rates. To assist the Town of Peace River in achieving sustainable rate structures that adequately fund water and wastewater operations, capital costs, debt, and reserves with reasonable, fair, and equitable rates. 1. Provide a Financial Plan sufficient to satisfy the Town of Peace Rivers goal of full cost recovery and sustainable operations for the water and wastewater systems for a period of at least 10 years. Study Requirements: 1. The recommended rate structure shall be based on full cost of service and shall be sufficient to meet the short and long-term revenue requirements related to water and wastewater operating, capital expenditures and debt. 2. The study shall recommend rate structures that consider and make allowances for: a. Current and future cost of providing water and wastewater in accordance with current and anticipated standards and regulations. b. Growth estimates as established by the Town or other supporting documents. c. The Asset Management Plan and asset condition assessments for the supply, distribution, and treatment infrastructure. d. Funding requirements for all unfunded liabilities or other financial obligations required to be incorporated under Public Sector Accounting Standards. e. Best practices in the areas of debt management and other financial tools. f. Risk/uncertainty associated with revenue flows. g. Recommendations of amendments and/or alignment the current by-laws, policies, and practices to the proposed new Utility Rate Model. h. Other impacts or factors as identified. 3. Options for rate structures that is consistent with industry practices. 9 4. The benefits of moving away from the current rate structure shall document the impact on ratepayers. 5. Projected impacts that proposed rate structures will have on future consumption patterns and the resulting impact on the cost of providing services. 6. Provide strategies for implementing significant rate changes to reduce adverse impact on specific customer classes. 7. Justifications for any special classes of customers shall be adequately documented, including financial impacts. 8. The recommended rate structure shall result in no decrease to the stability of the current revenue streams. 9. The impacts of funding past and current depreciation should be incorporated into the rate structure and impacts detailed. 10. The recommended rate structure shall be easy to administer, understand and communicate to the end users. 11. Review of the Town's billing system to ensure the recommended rate structure can be easily implemented. If not, the costs to amend the systems must be documented and quantified. 12. The plan must include information on the projected financial information, which includes projected financial position, projected financial operations and projected cash flow. The method of Contractor Selection has not been Determined at this time.
Conceptual
Water / Sewer
Public - City
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 14, 2024
Multiple Locations, Peace River, AB
Related To This Project
Peace River, AB
Bid Date: Nov 01 2023
Peace River, AB
Bid Date: Nov 01 2023
Peace River, AB
--
Peace River, AB
Bid Date: Apr 02 2024
Peace River, AB
--
Peace River, AB
Bid Date: Aug 22 2019
Peace River, AB
Bid Date: Sep 13 2023
Peace River, AB
Bid Date: Jul 29 2020
Peace River, AB
Bid Date: Feb 21 2019
Peace River, AB
Bid Date: Sep 01 2023
Peace River, AB
Bid Date: Aug 11 2023
Peace River, AB
Bid Date: Aug 15 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Stop wasting time. Get and stay ahead of your competition.
Get instant access to the most complete and actionable commercial construction data available. Try it for free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.