Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and addition to a detention facility in Texarkana, Arkansas. Completed plans call for the addition of a 6,500-square-foot detention facility; and for site work for a detention facility.
Plans call to expand the jail's inmate detention space by at least 6,500 square feet to accommodate another 48 beds.Formerly known as the Jail Expansion Phase 1 - Miller County. As of September 7, 2023, addendum 5 has been released and will be added. This project is out to bid for select bid packages. Notice is hereby given that MILLER County Arkansas Government is requesting bids for work included in the following bid packages for the construction of the new MILLER COUNTY QUARANTINE ADDITION to be located on County owned property in TEXARKANA, AR 72701: Bid Package No. DESCRIPTION Bid Package No. 2 Security and Non-Security Fencing and Gates Package Bid Package No. 3 Cast-in-Place Concrete Package Bid Package No. 5 Structural Steel & Miscellaneous Fabrications Package Bid Package No. 6 Caulking, Sealing, Dampproofing & Fire Caulking Package Bid Package No. 8b Acoustical Ceilings Package Bid Package No. 9 Epoxy Resin Composition Flooring and Walls Package Bid Package No. 13 Fire Protection Sprinkler Systems Package Bid Package No. 16 Aluminum Walkway Covers Package An addition adjacent to the building of 1,420 sf with 2 hour separation walls used to isolate the additional areas from the existing facility. An addition separated from the existing building as a separate structure is to be added of 4,805 SF. Each structure will be one story. Construction is expected to start November 2023. Construction is anticipated to take approximately eleven (11) months, with completion October 2024. The estimated value listed is that of the total project value.
Post-Bid
Jails / Prisons
$3,700,000.00
Public - County
Addition, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 13, 2023
November 13, 2023
2300 East St, Texarkana, AR
Related To This Project
Texarkana, AR
Bid Date: Sep 28 2023
Texarkana, AR
Bid Date: Sep 08 2022
Texarkana, AR
Bid Date: Oct 17 2023
Texarkana, AR
Bid Date: Dec 19 2023
Texarkana, AR
Bid Date: Apr 10 2024
Texarkana, AR
Bid Date: Jan 23 2024
Texarkana, AR
Bid Date: May 11 2021
Texarkana, AR
Bid Date: Jul 24 2019
Texarkana, AR
Bid Date: Sep 07 2023
Texarkana, AR
Bid Date: Sep 19 2023
Texarkana, AR
--
Texarkana, AR
Bid Date: Aug 16 2023
Texarkana, AR
Bid Date: Aug 16 2023
Texarkana, AR
Bid Date: Jul 12 2023
Texarkana, AR
Bid Date: Feb 07 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.