BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Westbrook, Maine. Contact the soliciting agency for additional information.

The City envisions that there will be four main tasks for the successful firm. Those are as follows: 1.Geotechnical and Survey Services: The firm will determine the right-of-way of the road within project limits. The survey work shall also include locating all site features including utilities, driveways, curb, sidewalks, landscaping, fences, property lines, two-foot topography, etc. within the project limits. Borings will be part of the design package to determine the subsurface layers of the project. This is an unbuilt corridor. 2.Roadway and Intersection Design: The firm will assist city representatives in the design and layout of the project. The work shall consist of storm drain and roadway design. There is no sewer in this area of roadway. Stormwater management retrofits to improve runoff quality will be considered, where applicable. This work shall extend at each intersection as far as necessary to properly construct the project. Sidewalks and driveways shall also be included in the design. The production of drawings setting forth in detail the requirements for construction of the project are required. Preparation of an estimated cost for various alternatives will also be expected. During the design process, one to two public meetings will be held to receive public input on the design. 3.Preparation of Preliminary Plans: The firm will prepare plans so that they can be used for public presentations and funding applications. All questions shall be directed, in writing, to Katherine Kelley, Assistant City Engineer, at least three business days before the opening date. Questions received after this time will not be addressed. Responses from the City that substantially alter this RFP will be issued in the form of a written addendum to all those that have expressed interest in the project. Oral explanations or interpretations given before the award of the contract will not be binding. All proposals submitted shall remain open to acceptance for ninety days from their opening.

Conceptual

Roads / Highways

Public - City

Service, Maintenance and Supply

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
31
Bidding Soon
717
All Active Projects
241
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 23, 2024

img_map_placeholder

US-302, Westbrook, ME

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.