BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a pre-engineered storage facility in Forest View, Illinois. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

Consists of constructing a salt storage facility, and all other appurtenant construction. All work will be in conformance with the "Standard Specifications for Road and Bridge Construction", dated January 1, 2022, and the "Uniform Development Ordinance" of the Village Of Lemont, latest edition, as amended. Only qualified Contractors who can furnish satisfactory proof that they have performed work of similar nature as Contractors will be entitled to receive Plans and submit Proposals. In order to meet this requirement, at the request of the Engineer, bidders will be required to submit a "Statement of Experience" consisting of a list of previous projects of similar nature in order to receive Plans. The Owner reserves the right to issue Bid Documents only to those Contractors deemed qualified. All Proposals must be accompanied by a Bank Cashiers Check, Bank Draft, Certified Check, or Bid Bond for not less than five percent (5%) of the total amount of the Bid, or as provided in the applicable sections of the Standard Specifications. No Bid may be withdrawn after opening of Proposals without the consent of the Owner for a period of forty-five (45) days after the scheduled time of opening of Bids. The Contractor will be required to furnish a labor and material Performance Bond in the full amount of the Contract. The Contractor will be required to pay Prevailing Wages in accordance with all applicable laws. This Contract will be awarded to the lowest responsive and responsible bidder considering conformity with the terms and conditions established by the Village in the Proposal and Contract documents. The issuance of Plans and Proposal forms for bidding based upon a pre-qualification rating shall not be the sole determinant of responsibility. The Village reserves the right to determine responsibility at the time of award, to reject any and all Proposals, to re-advertise the proposed improvements, and to waive technicalities.

Bid Results

Warehouse / Distribution - Pre-Engineered Storage Building

$224,347.00

Public - City

New Construction, Site Work

8

12

5

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
173
Active Projects
89
Bidding Soon
1,781
All Active Projects
774
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 8, 2023

November 7, 2023

img_map_placeholder

To Be Determined, Forest View, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.