Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work and asbestos abatement for a municipal facility in Alexander City, Alabama. Completed plans call for the demolition of a municipal facility; for site work for a municipal facility; and for asbestos abatement for a municipal facility.
The City seeks to engage qualified building demolition contractors to assist Alexander City's Community Development Department in the demolition of a vacant, commercial property located at 1 and 4 Court Square, Alexander City, AL 35010. Demolition work will include the demolition and removal of building, basements, and foundations, as well as, the demolition and removal of site improvements and foundation landscaping. This Scope of Work includes the following components with respect to the Property: 1. Removal and disposal of asbestos in accordance with State of Alabama Asbestos Abatement Specifications and the federal Clean Air Act (and all implementing regulations). 2. Demolition and removal of building, asbestos, basements, concrete/asphalt slabs, and foundations. 3. Demolition and removal of site improvements, including but not limited to foundation, parking slab, retaining wall, concrete sidewalk. 4. Installation of soil erosion-sedimentation control as required by ADEM regulation. Best practices for erosion control are expected during the entire project. Question Submission Deadline: September 13, 2023, 4:30 pm CST Anticipated Award Date: November 6, 2023 Contract Proceed Date: May 1, 2024 Contract Completion Date: September 30, 2024 A Bid / Proposal Bond shall be executed in the amount of five percent (5%) of the total proposed amount, but shall not exceed ten thousand dollars ($10,000.00). The bond shall be presented within the proposal packet. All bid / proposal bonds shall be returned to the proposer after the contract's award. A Performance Bond shall be executed in the amount of one-hundred percent (100%) of the total proposed amount. The performance bond shall only be required of the awarded contractor, and shall be filed after the award of the contract but prior to the beginning of all work. A Payment Bond shall be executed in the amount of one-hundred percent (100%) of the total of all material and subcontracted labor cost. The City reserves the right to reject any and all proposals, to rebid the original or amended scope of services and to enter into negotiations with one or more respondents. The City reserves the right to make those decisions after receipt of responses. The City's decision on these matters is final. All communications must be in writing, sent by email to Amanda Thomas, Community Development Director and Stephanie Southerland, City Clerk . The subject line of the email must include RFP 24-01 Demolition Services. All questions must be received no later than September 8, 2023 5:00pm CST.
Bid Results
Municipal
$159,000.00
Public - City
Asbestos Abatement, Demolition, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 27, 2023
May 1, 2024
Multiple Locations, Alexander City, AL
Related To This Project
Alexander City, AL
Bid Date: Sep 21 2023
Alexander City, AL
Bid Date: Aug 31 2023
Alexander City, AL
Bid Date: Aug 31 2023
Alexander City, AL
--
Alexander City, AL
--
Alexander City, AL
Bid Date: Apr 15 2021
Alexander City, AL
--
Alexander City, AL
Bid Date: Jun 14 2022
Alexander City, AL
Bid Date: Aug 31 2023
Alexander City, AL
Bid Date: Sep 08 2023
Alexander City, AL
Bid Date: Sep 11 2023
Alexander City, AL
Bid Date: Sep 05 2023
Alexander City, AL
Bid Date: Aug 31 2023
Alexander City, AL
Bid Date: Aug 11 2023
Alexander City, AL
Bid Date: Aug 28 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.