BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Miramar, Florida. Conceptual plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

This project is included in the City of Miramar's Capital Improvement Plan fiscal years 2023-2027. As of November 30, 2023, further details regarding design and construction have not been identified. A firm timeline for construction has not been established; however, funding is allotted for construction for fiscal year 2024. A detailed scope has not yet been released. Construction of approximately between 10,000 to 12,000 linear feet of 4' wide sidewalk in neighboring streets surrounding the AC-Perry K-8 School located at 6850 SW 34 Street, Miramar, Florida 33025. The City applied and was approved for grant funding in the amount of $1,053,044 through the Florida Department of Transportation (FDOT) Safe Routes to Schools (SRTS) Program. The grant funding will be available in FY 25. The City of Miramar is responsible for costs related to design/engineering, Construction Engineering Inspections (CEI) and any other contingency costs that may arise during construction. Funding requested in FY 23 is for design, funding requested in FY 24 is for CEI, and funding requested in FY 25 is for construction which will be reimbursed as per the grant. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Sidewalks / Parking Lot

$700,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
45
Bidding Soon
1,093
All Active Projects
483
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2024

img_map_placeholder

Vicinity of AC Perry K-8, Miramar, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.