BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Vestaburg, Michigan. Completed plans call for the renovation of a educational facility.

Work Included Specific Items of Construction: 1 Coordinate delivery of material, storage and dispensation areas with Triangle's Site Superintendent prior to scheduling delivery to the project site. All delivery of materials to the site must be coordinated in order to facilitate timely installation. Laydown areas will be established as directed by the superintendent. 2 Provide continuous coordination with interfacing construction trades as required to complete construction activities of this work category as directed by Triangle's Site Superintendent. 3 The use of tobacco products will not be permitted on the project site. Failure to comply with this policy will be considered grounds for removal of any violators from the site. 4 Provide all labor, equipment, tools, hardware and miscellaneous materials necessary to receive, unload, inventory, protect, store and install work of each category including construction materials supplied by other work categories required to be installed under each work category. 5 This contractor will acknowledge and adhere to the construction schedule and sequencing. This may include an increase in manpower, material and equipment (including expediting & overtime costs) in order to maintain construction progress as directed by Triangle. All contractors are required to meet the updated progress schedules, with multiple crews if necessary and anticipate any and all possible weather conditions. 6 Multiple mobilizations may be required by each work category to meet the dynamic construction schedule and project sequencing requirements. Mobilizations will be at the discretion and direction of the Triangle's site superintendent. 7 Each work category is to perform its own cleanup, recycling and legal disposal of construction debris and hazardous waste related to its work category on a daily basis or as directed by Triangle. 8 Full compliance with all safety regulations and requirements of OSHA, local and State authorities and Triangle is mandatory. Failure to comply may result in the removal of contractor from the project site. Each contractor will be required to file their jobsite specific safety plan with Triangle prior to starting work onsite. 9 Contractor(s) will supply their own tools and equipment to perform their scope of work. All tools and equipment will be tagged or labeled with the appropriate company's name. 10 There will be no "General Contractor" on this project; any references to the general contractor, construction manager, Owner, and other assignments in the contract documents are hereby superseded by these work category descriptions and will be completed by the respective trade contractors assigned that work. 11 All contractors are responsible for the entire set of contract documents. 12 Allowances are not intended to cover any work specified by drawings, specifications, or work category descriptions. Allowances will be used only at the direction of the CM for unspecified work, unless noted otherwise. Contractors will be required to furnish time sheets to the superintendent daily for verification and invoice backup for all material costs.

Award

Educational

$69,900.00

Public - City

Renovation

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
51
Bidding Soon
691
All Active Projects
295
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 5, 2023

September 20, 2023

img_map_placeholder

7188 B Ave, Vestaburg, MI


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.