Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a mixed-use development in Vestaburg, Michigan. Completed plans call for the renovation of a educational facility.
Work Included Specific Items of Construction: 1 Coordinate delivery of material, storage and dispensation areas with Triangle's Site Superintendent prior to scheduling delivery to the project site. All delivery of materials to the site must be coordinated in order to facilitate timely installation. Laydown areas will be established as directed by the superintendent. 2 Provide continuous coordination with interfacing construction trades as required to complete construction activities of this work category as directed by Triangle's Site Superintendent. 3 The use of tobacco products will not be permitted on the project site. Failure to comply with this policy will be considered grounds for removal of any violators from the site. 4 Provide all labor, equipment, tools, hardware and miscellaneous materials necessary to receive, unload, inventory, protect, store and install work of each category including construction materials supplied by other work categories required to be installed under each work category. 5 This contractor will acknowledge and adhere to the construction schedule and sequencing. This may include an increase in manpower, material and equipment (including expediting & overtime costs) in order to maintain construction progress as directed by Triangle. All contractors are required to meet the updated progress schedules, with multiple crews if necessary and anticipate any and all possible weather conditions. 6 Multiple mobilizations may be required by each work category to meet the dynamic construction schedule and project sequencing requirements. Mobilizations will be at the discretion and direction of the Triangle's site superintendent. 7 Each work category is to perform its own cleanup, recycling and legal disposal of construction debris and hazardous waste related to its work category on a daily basis or as directed by Triangle. 8 Full compliance with all safety regulations and requirements of OSHA, local and State authorities and Triangle is mandatory. Failure to comply may result in the removal of contractor from the project site. Each contractor will be required to file their jobsite specific safety plan with Triangle prior to starting work onsite. 9 Contractor(s) will supply their own tools and equipment to perform their scope of work. All tools and equipment will be tagged or labeled with the appropriate company's name. 10 There will be no "General Contractor" on this project; any references to the general contractor, construction manager, Owner, and other assignments in the contract documents are hereby superseded by these work category descriptions and will be completed by the respective trade contractors assigned that work. 11 All contractors are responsible for the entire set of contract documents. 12 Allowances are not intended to cover any work specified by drawings, specifications, or work category descriptions. Allowances will be used only at the direction of the CM for unspecified work, unless noted otherwise. Contractors will be required to furnish time sheets to the superintendent daily for verification and invoice backup for all material costs.
Award
Educational
$69,900.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 5, 2023
September 20, 2023
7188 B Ave, Vestaburg, MI
Related To This Project
Vestaburg, MI
Bid Date: May 03 2024
Vestaburg, MI
Bid Date: Dec 14 2022
Vestaburg, MI
Bid Date: Nov 01 2022
Gladstone, MI
Bid Date: Sep 01 2023
Davison, MI
Bid Date: Sep 20 2023
Northville, MI
Bid Date: Sep 13 2023
Boyne City, MI
Bid Date: Sep 15 2023
Detroit, MI
Bid Date: Sep 25 2023
Douglas, MI
Bid Date: Sep 21 2023
Portage, MI
Bid Date: Sep 12 2023
Sturgis, MI
Bid Date: Sep 11 2023
Bay City, MI
Bid Date: Oct 20 2023
Warren, MI
Bid Date: Sep 06 2023
Harbor Springs, MI
--
Coopersville, MI
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.