BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

New construction of a warehouse / distribution facility in Sault Ste. Marie, Ontario. Completed plans call for the construction of a 11,877-square-foot, one-story above grade warehouse / distribution facility.

FedNor is providing the Sault Ste. Marie Airport Development Corp., with $660,000 to construct a new building that will allow for the expansion of JD Aero. The funding is part of a $2-million project. The Sault Ste. Marie Airport Development Corp. will inject $200,000 into the project and the remainder comes from other funding partners, said Airport CEO Terry Bos. JD Aero has been expanding its operations at the Sault Ste. Marie Airport since it began there about a decade ago. The new 11,250-square-foot building will accommodate new growth for JD Aero, which specializes in maintenance, repair and overhaul of aircraft. It will be added to the 81,000-square-foot space JD Aero currently operates from. The building will provide additional space for equipment, parts and materials, which will open the hangar floor area and allow the company to expand its maintenance market with larger jets, said MP Terry Sheehan, who made the announcement. Construction, expected to begin in the coming weeks, should be completed by spring. About 15 construction jobs will be created throughout the development phase, Sheehan said. Sheehan said collaboration for projects like this one – and others that have resulted in funding for the airport – is critical to economic development and the safety of the airport. “The Sault Ste. Marie Airport Development Corp., and JD Aero have both received notoriety around the world and that’s because they’re located here, and people see aircraft from around the world and comment on it,” he said. “I think you’ll see a lot more collaboration and projects come to fruition because of the continued relationships between the private and public sector.” JD Aero leases space at the airport, and its growth is beyond what Bos had ever envisioned when the company launched its operations in Sault Ste. Marie. “I expected them to be one hanger forever. Not in my wildest dreams did I think we’d see the growth that we’ve seen,” he said. “Look at them now. Two hangers and extra space and who knows what the future brings.” The expansion “is huge for us,” Bos told The Sault Star following the announcement. “They’re bringing in a lot of aircraft, which we don’t have a lot of moving around right now.” Commercial flights are down to about 72 per cent of levels pre-pandemic and passenger flights are hovering around 75 per cent of pre-pandemic levels. Bos said the expansion is not only great news for JD Aero and their operations, but to the airport as well, because it means the company will be continuing and growing its operations in the long haul. “It helps me sleep at night knowing we have them here for a long time,” Bos said. Julian Chin, JD Aero’s operations manager, said the expansion allows the company to grow its maintenance of the Embraer 175 Jet, a passenger plane that holds between 70-100 people. Expansion to this type of aircraft began about one year ago, and is continuing, Chin added. Chin said about a dozen of the jets have moved through the facility but more space is needed to keep parts and equipment inside, given Sault Ste. Marie’s weather. The Embraer 175 jet is becoming a more popular aircraft that JD Aero’s clients are moving towards and servicing needs to be done. Traditionally, the maintenance company has specialized in the Dash 8 400’s, a 74-seater passenger aircraft, which it still services. “It looks like we’ll be moving forward to have a mixture of this particular platform,” he said. Chin said JD Aero is always looking for new aviation maintenance staff but, like many industries, there is currently a shortage of workers. Current staff numbers are hovering around 100 and while the company would like to hire more staff, Chin wouldn’t provide specifics on how many more, saying the numbers must be weighed against operational requirements and growth projections. Awarded value not released for publication.

Award

Warehouse / Distribution

$1,700,000.00

Public - City

New Construction

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
8
Bidding Soon
57
All Active Projects
20
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 13, 2023

October 3, 2023

img_map_placeholder

475 Airport Rd, Sault Ste. Marie, ON

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.