BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a residential development in Austin, Texas. Design plans call for the construction of a residential development; and for site work for a residential development.

Plans call to develop 30 to 50 units of attached and detached housing to be sold by AHFC as long-term affordable owner-occupied housing held within its Community Land Trust. The property, located at 5901 Drowsy Willow Trail, is an approximately 2.7-acre piece of vacant land located in the Dove Springs neighborhood of southeast Austin. The property was purchased by AHFC in 2021 using general obligation bonds approved by City residents in 2018. The property is level, rectangular in shape, and fronted on the north by Village Square Drive and the east by Nuckols Crossing Road. The property is bordered on the west by the Villages at Pleasant Valley condominiums and on the south, across an urban creek, by single family homes. The southern half of the property is within a Critical Water Qualify Zone, and the 100- and 500-year floodplain to a lesser degree. These environmental features limit the developable area of the property and informed AHFC's development concept for this property. The property currently has a Planned Unit Development zoning district designation that was approved in 1979, which are the entitlements under which the neighboring multifamily condominium property was developed. The existing zoning regulations permit the development of no more than twenty-four dwelling units on this property. Given this limitation, it is anticipated the property will need to be rezoned prior to development. AHFC has submitted Zoning and Neighborhood Plan Amendment applications to begin rezoning the property to a zoning category compatible with the proposed development concept. As of October 2, 2024, the project is in design. However, information regarding design firm has not been released. A building permit will be applied and a tentative bid schedule for contractors are scheduled for November 2024. However, the firm timelines have not been determined. Construction is slated to begin in August 2025.

Design

Residential Subdivision

$20,000,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
33
Bidding Soon
2,396
All Active Projects
925
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.