Site work and paving for a mixed-use development in Modesto, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.
VAULT ID: 14-D-0127 Project Duration 325 Working Days License Requirements A California State Contractor License The purpose of the project is to implement improvements to address security, traffic and parking deficiencies in the following areas: roadway in front of plant, plant entrance, parking, septage station and Vaccon facility. Q&A Monday, September 19, 2023 Email all questions to RWRF_Sutter_Parking_Lot_And_Security_Upgrade_Bid_Questions@docs.e-builder.net by 4:00 p.m., no later than 7 business days prior to the bid opening A. The Contractor shall procure the services of a single Process Control System Supplier (PCSS) to furnish and install all materials, equipment, labor and services, except for those services and materials specifically noted, required to achieve a fully integrated and operational system as specified herein and in other Specification Sections listed below. B. Requirements specified in this Section apply to all equipment specified in the above sections, unless otherwise specified. The work shall include furnishing, installing and testing the equipment and materials detailed in the following Sections: 1. 13590 Control Panels and Panel Mounted Equipment C. Auxiliary and accessory devices necessary for system operation or performance, such as transducers, relays, signal amplifiers, intrinsic safety barriers, signal isolators, software, and drivers to interface with existing equipment or equipment provided by others under other Sections of these specifications, shall be included whether they are shown on the Drawings or not. D. Substitutions on functions or type of equipment specified shall not be acceptable unless specifically noted. In order to confirm compatibility between all equipment, coordinate all interface requirements with mechanical and electrical systems and furnish any signal isolation devices that might be required. E. Equipment shall be fabricated, assembled, installed and placed in operating condition in full conformity with the project Specifications, Drawings, engineering data, instructions, and recommendations of the equipment manufacturer as approved by the Engineer. F. To facilitate the Owner's future operation and maintenance, similar products (e.g., differential pressure transmitters, SCADA I/O cards) shall be supplied from the same manufacturer. G. All equipment and installations shall satisfy applicable Federal, State and local codes. H. Use the equipment, instrument, and loop numbering scheme that has been developed and shown on the Drawings and specifications in the development of the submittals. Do not deviate from or modify said numbering scheme without the Engineer's approval. The Payment of Prevailing Wages is Required on this Project. B. The Work to be performed by the Contractor generally includes: 1. Furnishing all labor, superintendence, materials, power, water, tools, equipment and services required by the Contract Documents or required to complete the Work. 2. Coordinate work of all trades. 3. Furnishing and installing miscellaneous items incidental to or necessary for completion of the Work, whether these items are specifically indicated in the Contract Documents or not. C. The Work consists of construction of the following items: 1. Worker Safety and Protection 2. Storm Water Quality Control 3. Field Engineering 4. Roadway Improvements and Traffic Striping in Robertson Road and Sutter Avenue 5. Driveway and Parking Lot Improvements 6. Guard Booth Construction 7. Septage Receiving Station Equipment and Piping 8. Vac-Con Facility Retaining Wall Construction 9. Vac-Con Truck Pre-Engineered Canopy Structure 10. Landscaping 11. Electrical Site Distribution Power, Signal and Lighting 12. Septage Receiving Station Electrical
Award
Roads / Highways
$7,272,462.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 3, 2023
December 4, 2023
1221 Sutter Ave, Modesto, CA
Related To This Project
Modesto, CA
Bid Date: Dec 14 2021
Modesto, CA
Bid Date: Dec 21 2021
Modesto, CA
Bid Date: Dec 01 2021
Modesto, CA
Bid Date: Sep 09 2021
Modesto, CA
Bid Date: Nov 18 2021
Modesto, CA
--
Modesto, CA
Bid Date: Dec 21 2021
Modesto, CA
--
Modesto, CA
Bid Date: Sep 06 2023
Modesto, CA
Bid Date: Sep 06 2023
Modesto, CA
Bid Date: Sep 06 2023
Modesto, CA
Bid Date: Sep 12 2023
Modesto, CA
Bid Date: Sep 05 2023
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.