Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a mixed-use development in Hutto, Texas. Completed plans call for site work for a development; playground / park / athletic field; sidewalk / parking lot; and swimming pool.
The project design team is led by Burditt Consultants, LLC. The project is 34 Acre site at Fritz Park which will be renovated in multiple phases. The City intends to renovate Fritz Park to establish its place as the Citys flagship park with a regional impact. The newly renovated park will serve a full diverse array of residents across all ages and abilities with a focus on community gathering and active use year-round. The scope of services for the Project is intended to provide a complete and useable facility for the City which can be put into operation immediately after acceptance by the City. Reference Number 0000328927 The City of Hutto will accept Statements of Qualifications (SOQ) for CMAR Services for Construction Improvements within the approximately 34 Acre site at Fritz Park in multiple phases for complete renovation that may include pond, elaborate splashpad and playground plaza, playground upgrades for all-inclusive feature, connected system of pathways circulating throughout the park, basketball court resurfacing, addition of shade structures, parking lot, and other improvements. Job Location Fritz Park Hutto, TX Anticipated First Phase Construction Start - Last Quarter (December), 2023 Anticipated Completion of First Phase - Second Quarter, 2024 Anticipated Second Phase Construction Start - Second Quarter, 2024 Anticipated Completion Second Phase Construction Second Quarter, 2025 *The right is reserved, as the interest of the City may require, to reject any and all bids based on past experience with the prime contractor and/or his listed subcontractors, and to waive any informalities in bids received. The right is also reserved to eliminate a portion of the work or add additional work as required to keep the total contract amount within the funds budgeted. The City of Hutto also has the right to award any parts or combination of parts of the project it deems necessary
Post-Bid
Playgrounds / Parks / Athletic Fields
$1,017,700.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 28, 2023
December 29, 2023
400 Park Ave, Hutto, TX
Related To This Project
Hutto, TX
Bid Date: Sep 29 2023
Hutto, TX
--
Hutto, TX
Bid Date: Sep 18 2023
Hutto, TX
Bid Date: Nov 15 2023
Hutto, TX
--
Hutto, TX
--
Hutto, TX
--
Hutto, TX
--
Hutto, TX
--
Hutto, TX
Bid Date: Sep 25 2023
Hutto, TX
Bid Date: Sep 25 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.