BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 25, 2025 at 7:00 PM

Updated February 26, 2025

Site work and paving for a road / highway in Charlottesville, Virginia. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

Update: https://www.rivanna.org/wp-content/uploads/2024/06/2025-2029-CIP-Final-Draft.pdf The Urban Finished Water Master Plan identified several necessary upgrades to the urban water distribution system to improve system performance and reliability. One of the identified improvements is an upgrade and extension of the existing RWSA water main along the Emmet Street corridor from the UVA Dell Pond to Hydraulic Road. This project will utilize planned road, streetscape, utility, and development projects along the Emmet Street corridor to complete portions of the Emmet Street water main improvements as betterment, with the goal of completing the approximately 2-mile-long water main by 2030. The project scope includes planning and coordination between RWSA, UVA, the City of Charlottesville, and VDOT, design services for the betterment and "gap" sections of water line, construction funding, and construction management services. Current identified projects with betterment opportunities include: the UVA Ivy Corridor Redevelopment, UVA Contemplative Commons, the City of Charlottesville Emmet Streetscape Projects (multiple phases), and intersection improvements at Barracks Road, and the US-250/Emmet Street Interchange. Project is included in Rivanna Solid Waste Authority Fiscal Year 2025-2029 Page No.25 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- A detailed scope of work has not been disclosed. As of September 18, 2023, this project is included in the Rivanna Solid Waste Authority's Fiscal Year 2024-2028 CIP and funding allotted for FY 2024, FY 2025, FY 2026, FY 2027 and FY 2028. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$6,740,000.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
242
Active Projects
130
Bidding Soon
1,846
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2026

Project location map

To Be Determined, Charlottesville, VA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.