BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Bakersfield, California. Completed plans call for the renovation of a educational facility.

License Requirements B Liquidated Damages $3,500.00 per calendar day Start/Delivery Date October 16, 2023 Project Duration 300 Calendar Days This project is part of the ESSER III (Elementary and Secondary School Emergency Relief) Expenditure Plan under the American Rescue Plan Act. A DSA 93 Pre-Application meeting for this project summarized in the Meeting Minutes dated 8/24/22. Primary aspects of the DSA 93 meeting and ESSER III are noted below. The ESSER III funding requires that the construction must be completed before September 2024. A. Mechanical unit replacements: 1. Replacement of unit ventilators campus wide. 2. Replacement of package units campus wide. 3. Replacement of small air handlers on classroom winds and new package units. 4. Replace building 100, 200, & 300 VAV control boxes. 5. Replacement of split system in 200 IT room. 6. Replacement of VAV zone dampers. B. Plumbing: Demolition of piping systems indicated or required to be removed or modified associated with HVAC systems/units. Replacement of condensate drains from air conditioning and air handling units. Final connections to equipment provided in other sections of these specifications or indicated as furnished by owner and installed contractor. C. Mechanical: Demolition as indicated on drawings. All equipment as shown on drawings or as specified to be provided. System energy balance, HVAC controls and start-up and commissioning of all HVAC Systems. D. Electrical: Demolition as indicated on drawings. Complete system of branch circuit wiring, conduit and distribution equipment for receptacles and HVAC per plan. Furnish and install panelboards and convenience outlets, etc. as shown per plans. E. Fire Alarm: The fire alarm system is existing. Provide new intelligent reporting, microprocessor-controlled fire detection carbon monoxide detectors install as indicated per plan and specs.

Bid Results

Educational

$1,535,291.00

Public - County

Renovation

67

18

4

7

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
27
Bidding Soon
564
All Active Projects
239
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 28, 2023

October 16, 2023

img_map_placeholder

8501 Stine Rd, Bakersfield, CA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.