BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Porterville, California. Completed plans call for the renovation of a educational facility.

KITCHEN WAREHOUSE Equipment: 10Wx 12L x 8.5H Walk-in Cooler with Membrane Roof New Condensing Unit and Evaporator Coil New Copper Refrigeration Lines & Fittings Electrical Wiring, Electrical Connections, Electrical Conduit and Service Disconnect Scope of Work Demo and dispose of existing asphalt for walk in location. Install form boards and rebar. Dig and finish condensation drain. Pour and finish concrete slab. Let harden prior to walk in construction. Install (4) 6 round bollards for safety and protection of the walk in. Bollard Footings 24w x 40d Construct new walk-in enclosure and anchor to the concrete pad as per CA code. Install new refrigeration. Condenser to be installed on roof of walk in. Install new service electrical disconnect switch at the condenser. Run electrical supply from existing electrical panel and upgrade breaker switch. Run power wire to condenser, evaporator coil, LED lighting and temperature alarm. Perform factory start up and adjust temperature setting. BURTON MIDDLE SCHOOL Equipment 10Wx 14L x 81/2 H Walk-in Cooler/Freezer Combo Low and Medium Temperature Refrigeration Equipment New Copper Refrigeration Lines & Fittings Electrical Wiring, Electrical Connections, Electrical Conduit and Service Disconnects Scope of Work Construct new walk-in and anchor to the floor as per CA code. Install new refrigeration. Condensers to be secured to roof mounted iron stands. Penetrate ceiling and roof for refrigeration lines. Run electrical supply from existing electrical panel to new refrigeration equipment. Run power wire to condenser, evaporator coil and LED lighting. Install electrical service disconnect switches at condenser locations. Confirm electrical connectivity and turn on power supply. Perform factory start up and make adjustments as necessary. BIDDER IS TO PROVIDE SEPARATE PROPOSALS FOR EACH SITE. PLEASE NOTE THIS PROJECT IS SUBJECT TO PREVAILING WAGE RATES AND DIR MONITORING. IF YOU SHOULD HAVE ANY QUESTIONS PLEASE FEEL FREE TO EMAIL ME -- Omar Flores Director of Maintenance and Facilities omar.flores@burtonschools.org (559) 781-8020 Ext. 17002

Post-Bid

Educational

$200,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
16
Bidding Soon
329
All Active Projects
112
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 15, 2023

October 16, 2023

img_map_placeholder

252 N Westwood St, Porterville, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.