BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Elmore, Ohio. Working plans call for site work for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

As of 10/25/2023 bids came over 10 % and Owner decided to do inhouse. Witty Park Kayak Launch Improvements The scope of work consists of the installation of approximately 306 sf of 6' wide x 4" thick concrete sidewalk, 4.1 cy of reinforced concrete for 6'x6' launch ramp landing, 2 each guide piles for floating launch dock, 105 sy of 8" thick concrete for loading/unloading drive area, restoration, and other necessary appurtenances. The opinion of the probable cost of construction is $65,000. A certified check, cashier's check or letter of credit in favor of the Village of Elmore, Ohio, in the amount of 10% of the bid. If the contract is awarded, a Contract Bond will be required, which is a 100% payment and performance bond. The successful bidder will be required to pay not less than the minimum wage rates established by the Department of Industrial Relations of the State of Ohio. The Village of Elmore, Ohio reserves the right to reject any and all bids, to waive any irregularity in any bid, and to determine the lowest and best bidder. completed and ready for final payment in accordance with paragraph 15.06 of the General Conditions on or before November 17, 2023.

Final Planning

Sidewalks / Parking Lot

$90,000.00

Public - City

Paving, Site Work

10

10

4

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
106
Active Projects
69
Bidding Soon
1,227
All Active Projects
465
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 20, 2023

November 22, 2023

img_map_placeholder

To Be Determined, Elmore, OH


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.