Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a military facility in East Fayetteville, North Carolina. Completed plans call for the renovation of a military facility.
The Department of Veterans Affairs, 2300 Ramsey St., Fayetteville, North Carolina has a requirement for a contractor to replace all roof areas designated on the provided design and per provided specifications. This includes lightning protection work for the Fayetteville VAMC. Repair D-Wing Roof of the Fayetteville Veteran Affairs Medical Center, in Fayetteville, NC 28301 The Department of Veterans Affairs has a construction requirement to Repair RoofingRepair D-Wing Roof of the Fayetteville Veteran Affairs Medical Center, in Fayetteville, NC 28301 The Department of Veterans Affairs has a construction requirement to Repair Roofing on D-Wing at the Fayetteville VA Medical Center in accordance with drawings and specifications. OF CONSTRUCTION IAW VAAR 836.204: Range between $1,000,000 and $2,000,000. Questions (RFI) due: December 13, 2023 by 12PM (Noon) EST. Must complete VAAR 852.219-75, VA NOTICE OF LIMITATIONS ON SUBCONTRACTING--CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION, upon submission or will be considered non-responsive. . The Contractor shall begin within 14 calendar days and complete it within 480 calendar days after receiving *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. on D-Wing at the Fayetteville VA Medical Center in accordance with drawings and specifications. OF CONSTRUCTION IAW VAAR 836.204: Range between $1,000,000 and $2,000,000. Questions (RFI) due: December 13, 2023 by 12PM (Noon) EST. Must complete VAAR 852.219-75, VA NOTICE OF LIMITATIONS ON SUBCONTRACTING--CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION, upon submission or will be considered non-responsive. The Contractor shall develop a Critical Path Method (CPM) plan and schedule demonstrating fulfillment of the contract requirements (Project Schedule), and shall keep the Project Schedule up-to-date in accordance with the requirements of this section and shall utilize the plan for scheduling, coordinating and monitoring work under this contract (including all activities of subcontractors, equipment vendors and suppliers). Contractor shall provide all administration, supervision, labor, materials, tools, and equipment, and perform all operations necessary to demolish and renovate the D-Wing Roof Repair on Bldg. 1 of the Fayetteville Veterans Affairs Medical Center in accordance with the plans and specifications. The project entails the replacement of all roof areas designated on the provided design and as per provided specifications. This includes lightning protection work. Work will be performed according to project specifications and drawings. A security Accreditation Package is not required. The Contractor shall begin within 14 calendar days and complete it within 480 calendar days after receiving COMPLETION TIME: All work shall be completed within 450 calendar days from receipt of the Notice to Proceed. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Military
$2,000,000.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 3, 2024
March 4, 2024
2300 Ramsey St, East Fayetteville, NC
Related To This Project
East Fayetteville, NC
Bid Date: Sep 29 2023
East Fayetteville, NC
Bid Date: Sep 08 2023
East Fayetteville, NC
--
East Fayetteville, NC
Bid Date: Sep 27 2023
East Fayetteville, NC
Bid Date: Dec 17 2021
East Fayetteville, NC
Bid Date: Jan 13 2022
East Fayetteville, NC
Bid Date: Jan 05 2022
East Fayetteville, NC
Bid Date: Jan 04 2022
East Fayetteville, NC
Bid Date: Oct 05 2023
East Fayetteville, NC
Bid Date: Oct 05 2023
East Fayetteville, NC
Bid Date: Aug 24 2023
East Fayetteville, NC
Bid Date: Sep 12 2023
East Fayetteville, NC
Bid Date: Sep 27 2023
East Fayetteville, NC
Bid Date: Aug 21 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.