BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a military facility in East Fayetteville, North Carolina. Completed plans call for the renovation of a military facility.

The Department of Veterans Affairs, 2300 Ramsey St., Fayetteville, North Carolina has a requirement for a contractor to replace all roof areas designated on the provided design and per provided specifications. This includes lightning protection work for the Fayetteville VAMC. Repair D-Wing Roof of the Fayetteville Veteran Affairs Medical Center, in Fayetteville, NC 28301 The Department of Veterans Affairs has a construction requirement to Repair RoofingRepair D-Wing Roof of the Fayetteville Veteran Affairs Medical Center, in Fayetteville, NC 28301 The Department of Veterans Affairs has a construction requirement to Repair Roofing on D-Wing at the Fayetteville VA Medical Center in accordance with drawings and specifications. OF CONSTRUCTION IAW VAAR 836.204: Range between $1,000,000 and $2,000,000. Questions (RFI) due: December 13, 2023 by 12PM (Noon) EST. Must complete VAAR 852.219-75, VA NOTICE OF LIMITATIONS ON SUBCONTRACTING--CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION, upon submission or will be considered non-responsive. . The Contractor shall begin within 14 calendar days and complete it within 480 calendar days after receiving *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. on D-Wing at the Fayetteville VA Medical Center in accordance with drawings and specifications. OF CONSTRUCTION IAW VAAR 836.204: Range between $1,000,000 and $2,000,000. Questions (RFI) due: December 13, 2023 by 12PM (Noon) EST. Must complete VAAR 852.219-75, VA NOTICE OF LIMITATIONS ON SUBCONTRACTING--CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION, upon submission or will be considered non-responsive. The Contractor shall develop a Critical Path Method (CPM) plan and schedule demonstrating fulfillment of the contract requirements (Project Schedule), and shall keep the Project Schedule up-to-date in accordance with the requirements of this section and shall utilize the plan for scheduling, coordinating and monitoring work under this contract (including all activities of subcontractors, equipment vendors and suppliers). Contractor shall provide all administration, supervision, labor, materials, tools, and equipment, and perform all operations necessary to demolish and renovate the D-Wing Roof Repair on Bldg. 1 of the Fayetteville Veterans Affairs Medical Center in accordance with the plans and specifications. The project entails the replacement of all roof areas designated on the provided design and as per provided specifications. This includes lightning protection work. Work will be performed according to project specifications and drawings. A security Accreditation Package is not required. The Contractor shall begin within 14 calendar days and complete it within 480 calendar days after receiving COMPLETION TIME: All work shall be completed within 450 calendar days from receipt of the Notice to Proceed. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Military

$2,000,000.00

Public - Federal

Renovation

28

21

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
123
Active Projects
76
Bidding Soon
1,332
All Active Projects
519
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 3, 2024

March 4, 2024

img_map_placeholder

2300 Ramsey St, East Fayetteville, NC

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.