BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a military facility in Brunswick, Georgia. Completed plans call for the renovation of a military facility.

Award Details Contract Award Date: Sep 26, 2023 Contract Award Number: 70LGLY23PSSB00059 Task/Delivery Order Number: 70LGLY23PSSB00059 Contractor Awarded Unique Entity ID: XBMKBMFHALD7 Contractor Awarded Name: MIAMI TRIBAL SYSTEMS INTEGRATORS, LLC Contractor Awarded Address: Reston, VA 20191 USA Base and All Options Value (Total Contract Value): $7,463.92 Replace the Equipment Rack at Building 262 Room 1041 at Glynco, GA Background This Statement of Work (SOW) establishes and defines the requirements for the engineering, furnishing, installation, testing and documentation of inside and outside plant fiber optic and copper cabling at Glynco, GA. of Work The contractor shall provide all personnel, equipment, tools, materials, supervision, and all other components necessary to install, test and document inside and outside plant fiber optic and copper cabling at Glynco, GA All work performed in the design and installation shall conform to BICSI (Building Industry Consulting Services International) specifications to ensure consistency with current codes, standards, and regulations. The following BICSI publications apply. Outside Plant Design Reference Manual, 4th Edition and Telecommunications Distribution Methods Manual, 12th edition. General. Cable Testing. All copper cables will be tested in accordance with BICSI specifications to ensure no damage has occurred to the cable during installation. All copper cables shall be tested for cable faults prior to and after installation has been completed. If the cable is damaged during installation, the contractor shall replace the cable with one that is undamaged. All cable terminals and information boxes interface units shall be labeled with machine-generated labels. All cables shall be labeled at all termination points, building entrance terminals, patch panels, manholes, hand holes, and at all splice entrance/exit points. Restoration. All non-paved surfaces (grass, sod, gravel, etc.) must be restored within 7 days. Trenches and splice pits must be mechanically compacted to compensate for future earth settlement. All roads, streets, sidewalks of concrete or asphalt construction must be restored or repaved within 3 days from the time of backfilling and compaction. Grounding. Contractor shall ensure all equipment are secured and grounded to industry standards. Description of Task 4.1 Task 1: Replace Equipment Rack at Building 262 Room 1041 at Glynco, GA List of materials to be provided by the contractor. Approximately 1500' of Cat.6 Plenum Cable - Blue One (1) APC, AR3150 42U 78"H x 29"W x 42"D Cabinet Ten (10) Cat.6 Information Outlet - Blue Five (5) 2-port Flush mount Faceplate - Ivory Other Supplies as needed. Task 2: Replace Equipment Rack at Building 262 Room 1041 at Glynco, GA Contractor shall disassemble the copper and fiber cabling equipment from the two-post equipment rack in rm. 1041. FLETC team will remove all FLETC IT equipment. Contractor shall set the old equipment rack aside in room 1041. Contractor shall provide and install the new APC AR3150 enclosed cabinet in room 1041. Contractor shall reinstall the fiber and copper cable patch panels and the FLETC Network team will reinstall the network equipment. Contractor shall provide and install five (5) dual Cat 6 drops between the new equipment rack copper patch panel and five predetermined locations in room 1041A (Remote Helpdesk Suite). Contractor shall test label and tag the terminal, cables and patch panels. Contractor may be required to perform this task after FLETC duty hour Monday thru Friday, 0700-1700. Deliverables Equipment All equipment identified in 4.1 Documents Item identified in Task 1 and 2 Period of . Period of for this contract is not to exceed 90 days from contract award date. Contract Type This contract shall be a firm fixed price contract. Place of All Tasks work shall be performed at the Federal Law Enforcement Training Centers; US Department of Homeland Security; 1131 Chapel Crossing Road Brunswick, GA 31524. Section 508 Requirements (include in the SOW, PWS, or SOO) Section 508 of the Rehabilitation Act (classified to 29 U.S.C. 794d) requires that when Federal agencies develop, procure, maintain, or use information and communications technology (ICT), it shall be accessible to people with disabilities. Federal employees and members of the public with disabilities must be afforded access to and use of information and data comparable to that of Federal employees and members of the public without disabilities. All products, platforms and services delivered as part of this work statement that, by definition, are deemed ICT shall conform to the revised regulatory implementation of Section 508 Standards, which are located at 36 C.F.R. 1194.1 & Appendixes A, C & D, and available at https://www.ecfr.gov/cgi-bin/text-xSID=e1c6735e25593339a9db63534259d8ec&mc=true&node=pt36.3.1194&rgn=div5. In the revised regulation, ICT replaced the term electronic and information technology (EIT) used in the original 508 standards. ICT includes IT and other equipment. Exceptions for this work statement have been determined by DHS and only the exceptions described herein may be applied. Any request for additional exceptions shall be sent to the Contracting Officer and a will be made according to DHS Directive 139-05, Office of Accessible Systems and Technology, dated November 12, 2018, and DHS Instruction 139-05-001, Managing the Accessible Systems and Technology Program, dated November 20, 2018, or any successor publication. 2023 FLETC Operation and Support 70 0509 Firm fixed Price. All questions concerning this solicitation shall be submitted via email no later than 09/06/2023 to john.g.bennett@fletc.dhs.gov The subject of the email must contain "Question - SOLICITATION NUMBER [Offeror Name] 70LGLY23QSSB00128." Questions received after this date and time may not be answered prior to the closing date/time for receipt of responses. Offerors shall provide a statement of compliance with FAR 52.222-50, Combating Trafficking in Persons, requirements and confirm subcontractors will accomplish a statement of compliance upon award. Delivery: 90 Days After Award The price range is $5,000 - $10,000 This action will be awarded in September of 2023, Delivery/Needs to be completed: 90 Days After Award. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Military

$7,464.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
66
Active Projects
36
Bidding Soon
594
All Active Projects
237
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 11, 2023

October 11, 2023

img_map_placeholder

1131 Chapel Crossing Rd, Brunswick, GA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.