BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a road / highway in Antioch, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The City of Antioch is requesting bids for a three-year (3) contract with an option to extend two (2) additional years at the Citys sole discretion for the complete repair to areas in the roadway that have previously been damaged due to sanitary sewer or water distribution repairs (Service Cuts). The contractor will be required to remove all of the spoil to the specified depth and replace it with1/2 inch Type A asphalt. Questions relating to specifications or technical questions must be submitted via email to Bryan Pitts at bpitts@antiochca.gov Technical questions or requests shall be submitted no later than September 13, 2023, and will be answered by September 20, 2023. SCOPE OF WORK The City of Antioch is requesting bids for a three-year (3) contract with an option to extend two (2) additional years at the City's sole discretion for the complete repair to areas in the roadway that have previously been damaged due to sanitary sewer or water distribution repairs(Service Cuts). The contractor will be required to remove all of the spoil to the specified depth and replace it with 1/2 inch Type A asphalt. Work from the City provided Service Cuts List must be fully completed within 120 days of the date on the issued P.O. or the contractor is subject to liquidated damages specified in section 25 of General Conditions and agrees to reduce the price of the unfinished service cuts by 10%. A new Service Cuts List and P.O. will be provided on July 1, of every subsequent contract year. Work must be fully completed within 120 days of receiving the new fiscal year P.O. and new service cuts list. Work must begin within 15 days of the date on the Issued P.O. If the contractor does not work in a safe, productive, and efficient manner as deemed by the City's representative then the City may elect to move to the next responsible bidder. This decision will be up to the sole discretion of the City. Additional time will be allowed if additional work is added

Bid Results

Roads / Highways

$2,900,683.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
176
Active Projects
91
Bidding Soon
1,933
All Active Projects
813
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 27, 2023

October 27, 2023

img_map_placeholder

Multiple Locations, Antioch, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.