Site work for a municipal facility in Walla Walla, Washington. Completed plans call for site work for a municipal facility.

**As of October 30, 2023, this project has not yet been awarded. A timeline for award has not yet been established.** Compressed Natural Gas (Cng) Security Fence and Main Facility Security Fence. The first project is to place a single row of concrete ecology blocks with a four (4) foot tall chain link fence at the top of the ecology blocks along the South property line of Valley Transit's (VT) Main Facility to protect the Compressed Natural Gas (CNG) fueling station. The second project is to install a six (6) foot tall security fence and gates around the perimeter of the Valley Transit (VT) Main Facility. And lastly replace the existing ADA curb ramp with a new ADA compliant curb ramp at the main entrance to VT. This bid will also include the replacement of the existing Americans with Disabilities Act curb ramp with a new ramp which meets the current requirements of the ADA. Prospective Bidders are reminded that any changes to the RFB will be by written addenda only. Valley Transit hereby notifies all bidders that if will affirmatively ensure that in any contract entered into, pursuant to this advertisement, minority and women s business enterprises will be afforded full opportunity to submit bids in response to the invitation and will not be discriminated against on the grounds of race, color, national origin, or sex in consideration for an award. Valley Transit is an equal opportunity and affirmative action employer. Request for Clarification/Approved Equals Deadline September 20, 2023 by 4:00 PM, PDT bidders are encouraged to submit a request for clarification/equals if in their professional opinion another sizing option would better serve Valley Transit This Project in its entirety must meet Federal Buy America requirements. Physical work shall not begin until critical materials have been delivered on-site, so that work will occur continuously once started. Provide 1 year installation and product warranty. Construction must not interfere with the daily operations of Valley Transit. Concrete ecology Block specifications: Concrete ecology blocks must be in new condition using minimum 5,000 psi concrete, measuring 2' tall x 2' deep x 6' long. Valley Transit has chosen this specification, however, bidders are encouraged to submit a request for clarification/equals if in their professional opinion another sizing option would better serve Valley Transit. Blocks must have decorative finish on both face sides that are visible when installed, decorative finish to be chosen by Valley Transit at time of contractor placing the order or at the preconstruction meeting. Top of the blocks shall be flat except for a maximum of one (1) recessed lifting loop in the center of the block. All ecology blocks to be interlocking at both ends except the first and last block in line which will only be interlocking on one (1) end. Concrete Ecology Block installation: Removal and disposing of the existing red lava rock, filter fabric and split rail wood fencing. Create a gravel base for the concrete ecology blocks that meets standard compaction base requirements without excavation of existing soil. Install 1 %" minus gravel where red lava rock was removed and apply ground sterilant to all newly placed gravel. Base Preparation and Material: Gravel base shall be %" minus gravel compacted to create an adequate base to support one (1) row of 2 ft. x 2 ft. x 6 ft. concrete ecology blocks with 4' high chain link fence attached to the top of the blocks.

Post-Bid

Municipal

$70,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
6
Bidding Soon
130
All Active Projects
51
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 6, 2023

October 30, 2023

img_map_placeholder

Multiple Locations, Walla Walla, WA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.