Site work for a power facility in Marshall, Michigan. Conceptual plans call for site work for a power facility.

The Power Plant's primary functions include emergency backup power in the event of a transmission system or substation failure, as well as helping meet Midcontinent Independent System Operator (MISO) capacity requirements that are based on the City's peak electric demand. The City's average demand is approximately 20 MW, and 2022 peak demand exceeded 29 MW. CAT Generators are being added in 2024, but the need will continue. Additional generation should be planned for 2027/2028 to continue to help meet the City's MISO capacity obligations while also providing additional emergency backup service. This project is currently in included in the City of Marshall's FY 2024-2030 CIP. As of August 23, 2024, information regarding a design firm and the general contractor selection timeline has not been disclosed. A firm construction timeline has not been released. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Power Plant

$3,600,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
101
Active Projects
49
Bidding Soon
1,068
All Active Projects
435
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2028

img_map_placeholder

To Be Determined, Marshall, MI

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.